Skip to content

Instantly share code, notes, and snippets.

@mikelotis
Last active August 11, 2018 00:09
Show Gist options
  • Save mikelotis/98000626c7332958b47fe4f4fc0cf4fc to your computer and use it in GitHub Desktop.
Save mikelotis/98000626c7332958b47fe4f4fc0cf4fc to your computer and use it in GitHub Desktop.
Edmonton - Traffic Disruption (Sankey)
border: yes
width: 984
height: 660
d3.sankey = function() {
var sankey = {},
nodeWidth = 24,
nodePadding = 8,
size = [1, 1],
nodes = [],
links = [];
sankey.nodeWidth = function(_) {
if (!arguments.length) return nodeWidth;
nodeWidth = +_;
return sankey;
};
sankey.nodePadding = function(_) {
if (!arguments.length) return nodePadding;
nodePadding = +_;
return sankey;
};
sankey.nodes = function(_) {
if (!arguments.length) return nodes;
nodes = _;
return sankey;
};
sankey.links = function(_) {
if (!arguments.length) return links;
links = _;
return sankey;
};
sankey.size = function(_) {
if (!arguments.length) return size;
size = _;
return sankey;
};
sankey.layout = function(iterations) {
computeNodeLinks();
computeNodeValues();
computeNodeBreadths();
computeNodeDepths(iterations);
computeLinkDepths();
return sankey;
};
sankey.relayout = function() {
computeLinkDepths();
return sankey;
};
sankey.link = function() {
var curvature = .5;
function link(d) {
var x0 = d.source.x + d.source.dx,
x1 = d.target.x,
xi = d3.interpolateNumber(x0, x1),
x2 = xi(curvature),
x3 = xi(1 - curvature),
// prevent a perfectly straight path
// to avoid missing SVG path gradient bug in Chromium and mozilla
// minus 1.0 from y0
y0 = (d.source.y + d.sy + d.dy / 2) - 1.0,
y1 = d.target.y + d.ty + d.dy / 2;
return "M" + x0 + "," + y0
+ "C" + x2 + "," + y0
+ " " + x3 + "," + y1
+ " " + x1 + "," + y1;
}
link.curvature = function(_) {
if (!arguments.length) return curvature;
curvature = +_;
return link;
};
return link;
};
// Populate the sourceLinks and targetLinks for each node.
// Also, if the source and target are not objects, assume they are indices.
function computeNodeLinks() {
nodes.forEach(function(node) {
node.sourceLinks = [];
node.targetLinks = [];
});
links.forEach(function(link) {
var source = link.source,
target = link.target;
if (typeof source === "number") source = link.source = nodes[link.source];
if (typeof target === "number") target = link.target = nodes[link.target];
source.sourceLinks.push(link);
target.targetLinks.push(link);
});
}
// Compute the value (size) of each node by summing the associated links.
function computeNodeValues() {
nodes.forEach(function(node) {
node.value = Math.max(
d3.sum(node.sourceLinks, value),
d3.sum(node.targetLinks, value)
);
});
}
// Iteratively assign the breadth (x-position) for each node.
// Nodes are assigned the maximum breadth of incoming neighbors plus one;
// nodes with no incoming links are assigned breadth zero, while
// nodes with no outgoing links are assigned the maximum breadth.
function computeNodeBreadths() {
var remainingNodes = nodes,
nextNodes,
x = 0;
while (remainingNodes.length) {
nextNodes = [];
remainingNodes.forEach(function(node) {
node.x = x;
node.dx = nodeWidth;
node.sourceLinks.forEach(function(link) {
if (nextNodes.indexOf(link.target) < 0) {
nextNodes.push(link.target);
}
});
});
remainingNodes = nextNodes;
++x;
}
//
moveSinksRight(x);
scaleNodeBreadths((size[0] - nodeWidth) / (x - 1));
}
function moveSourcesRight() {
nodes.forEach(function(node) {
if (!node.targetLinks.length) {
node.x = d3.min(node.sourceLinks, function(d) { return d.target.x; }) - 1;
}
});
}
function moveSinksRight(x) {
nodes.forEach(function(node) {
if (!node.sourceLinks.length) {
node.x = x - 1;
}
});
}
function scaleNodeBreadths(kx) {
nodes.forEach(function(node) {
node.x *= kx;
});
}
function computeNodeDepths(iterations) {
var nodesByBreadth = d3.nest()
.key(function(d) { return d.x; })
.sortKeys(d3.ascending)
.entries(nodes)
.map(function(d) { return d.values; });
//
initializeNodeDepth();
resolveCollisions();
for (var alpha = 1; iterations > 0; --iterations) {
relaxRightToLeft(alpha *= .99);
resolveCollisions();
relaxLeftToRight(alpha);
resolveCollisions();
}
function initializeNodeDepth() {
var ky = d3.min(nodesByBreadth, function(nodes) {
return (size[1] - (nodes.length - 1) * nodePadding) / d3.sum(nodes, value);
});
nodesByBreadth.forEach(function(nodes) {
nodes.forEach(function(node, i) {
node.y = i;
node.dy = node.value * ky;
});
});
links.forEach(function(link) {
link.dy = link.value * ky;
});
}
function relaxLeftToRight(alpha) {
nodesByBreadth.forEach(function(nodes, breadth) {
nodes.forEach(function(node) {
if (node.targetLinks.length) {
var y = d3.sum(node.targetLinks, weightedSource) / d3.sum(node.targetLinks, value);
node.y += (y - center(node)) * alpha;
}
});
});
function weightedSource(link) {
return center(link.source) * link.value;
}
}
function relaxRightToLeft(alpha) {
nodesByBreadth.slice().reverse().forEach(function(nodes) {
nodes.forEach(function(node) {
if (node.sourceLinks.length) {
var y = d3.sum(node.sourceLinks, weightedTarget) / d3.sum(node.sourceLinks, value);
node.y += (y - center(node)) * alpha;
}
});
});
function weightedTarget(link) {
return center(link.target) * link.value;
}
}
function resolveCollisions() {
nodesByBreadth.forEach(function(nodes) {
var node,
dy,
y0 = 0,
n = nodes.length,
i;
// Push any overlapping nodes down.
nodes.sort(ascendingDepth);
for (i = 0; i < n; ++i) {
node = nodes[i];
dy = y0 - node.y;
if (dy > 0) node.y += dy;
y0 = node.y + node.dy + nodePadding;
}
// If the bottommost node goes outside the bounds, push it back up.
dy = y0 - nodePadding - size[1];
if (dy > 0) {
y0 = node.y -= dy;
// Push any overlapping nodes back up.
for (i = n - 2; i >= 0; --i) {
node = nodes[i];
dy = node.y + node.dy + nodePadding - y0;
if (dy > 0) node.y -= dy;
y0 = node.y;
}
}
});
}
function ascendingDepth(a, b) {
return a.y - b.y;
}
}
function computeLinkDepths() {
nodes.forEach(function(node) {
node.sourceLinks.sort(ascendingTargetDepth);
node.targetLinks.sort(ascendingSourceDepth);
});
nodes.forEach(function(node) {
var sy = 0, ty = 0;
node.sourceLinks.forEach(function(link) {
link.sy = sy;
sy += link.dy;
});
node.targetLinks.forEach(function(link) {
link.ty = ty;
ty += link.dy;
});
});
function ascendingSourceDepth(a, b) {
return a.source.y - b.source.y;
}
function ascendingTargetDepth(a, b) {
return a.target.y - b.target.y;
}
}
function center(node) {
return node.y + node.dy / 2;
}
function value(link) {
return link.value;
}
return sankey;
};
<!DOCTYPE html>
<html lang="en">
<head>
<meta charset="UTF-8">
<meta name="viewport" content="width=device-width, initial-scale=1.0">
<meta http-equiv="X-UA-Compatible" content="ie=edge">
<title>Document</title>
<style>
body {
margin-top: 30px;
}
svg {
display: block;
margin: 0 auto;
background-color: whitesmoke;
}
.node rect {
fill-opacity: .7;
shape-rendering: crispEdges;
}
.node text {
pointer-events: none;
font-family: Helvetica;
font-size: 12px;
fill: rgb(110, 107, 107);
}
</style>
</head>
<body>
<script src="https://cdnjs.cloudflare.com/ajax/libs/d3/4.13.0/d3.min.js"></script>
<script src="d3.sankey.js"></script>
<script src="https://cdnjs.cloudflare.com/ajax/libs/babel-standalone/6.26.0/babel.min.js"></script>
<script src="makeNetwork.js" lang='babel' type='text/babel'></script>
<script src="makeSankey.js" lang='babel' type='text/babel'></script>
</body>
</html>
const makeNetwork = function(csv) {
// log(csv);
// use only required attributes
const data = csv.map(element => {
return {
"Disruptions": "Disruptions",
"Status": element["Status"],
"Impact": element["Impact"],
"Activity Type" : element["Activity Type"],
"Traffic District": element["Traffic District"],
"Infrastructure": element["Infrastructure"]
};
});
// all the unique data values
const reduceFunc = (acc, curVal) => acc.concat(curVal);
const filterFunc = d => d.key != "";
const allValues = data.map(d => Object.values(d)).reduce(reduceFunc, [])
.filter(d => d != "");
// sankey nodes
const nodes = [...new Set(allValues)];
const sankeyNodes = nodes.map(d => { return {name: d}; });
// sankey flow order
// Disruptions → Status → Impact → Activity Type → Traffic District → Infrastructure
const order = [
"Disruptions", "Status", "Impact",
"Activity Type", "Traffic District", "Infrastructure"
];
//sankey links
const orderLinks = d3.range(1, order.length)
.map((d, i) => linkMaker(order[i], order[i + 1]))
.reduce(reduceFunc, []);
//sankey json
const network = {nodes: sankeyNodes, links: orderLinks};
return network;
// builds the links
function linkMaker(attr1, attr2) {
const links = d3.nest().key(d => d[attr1])
.key(d => d[attr2])
.entries(data)
.filter(filterFunc)
.map(d => {
const flows = d.values.filter(filterFunc).map(p => {
return {
source : nodes.indexOf(d.key),
target : nodes.indexOf(p.key),
value : p.values.length
};
});
return flows;
});
return links.reduce(reduceFunc, []);
};
};
const log = console.log;
const margin = {top: 30, right: 30, bottom: 30, left: 30};
const width = 964 - margin.left - margin.right;
const height = 600 - margin.top - margin.bottom;
const formatNumber = d3.format(",.0f");
const format = d => `${formatNumber(d)}`;
// define svg
const svg = d3.select("body").append("svg")
.attr("width", width + margin.left + margin.right)
.attr("height", height + margin.top + margin.bottom)
.append('g')
.attr("transform", `translate(${margin.left},${margin.top})`);
const defs = svg.append("defs");
// load file
d3.csv("Traffic_Disruptions(July-23-2018).csv", makeSankey);
function makeSankey(csv) {
// sankey data and colors (fills)
const sankeyJson = makeNetwork(csv);
const color = d3.scaleOrdinal().domain(sankeyJson.nodes.map(d => d.name))
.range([
"#ad002d","#3addc5","#e600d2","#007203","#6b008e",
"#ffa834","#005da3","#e76800","#ceaeff","#003503",
"#ffa3d8","#00885c","#ac2600","#331a49","#8e6b00",
"#ffa7ad","#5d3a00","#d5c593","#6d0014","#ffa178"]);
// sankey layout - note alters initial sankey data
const sankey = d3.sankey()
.nodeWidth(15)
.nodePadding(30)
.size([width, height])
.nodes(sankeyJson.nodes)
.links(sankeyJson.links)
.layout(100);
const path = sankey.link();
const defaultOpacity = 0.3;
// add links
const links = svg.append('g').selectAll(".link")
.data(sankeyJson.links).enter()
.append("path")
.attr("class", "link")
.attr('d', path)
.style("stroke-width", d => Math.max(1, d.dy))
.style("fill", "none")
.style("stroke-opacity", defaultOpacity)
.sort((a, b) => b.dy - a.dy)
.on("mouseover", function(){
d3.select(this).style("stroke-opacity", 0.5);
})
.on("mouseout", function(){
d3.select(this).style("stroke-opacity", defaultOpacity);
});
links.append("title")
.text(d => `${d.source.name} → ${d.target.name}\n${format(d.value)} Disruptions`);
// add nodes
const node = svg.append('g').selectAll(".node")
.data(sankeyJson.nodes)
.enter().append('g')
.attr("class", "node")
.attr("transform", d => `translate(${d.x},${d.y})`);
node.append("rect")
.attr("height", d => d.dy)
.attr("width", sankey.nodeWidth())
.style("fill", d => {
if(color.domain().indexOf(d.name) > -1){
return d.color = color(d.name);
} else {
return d.color = "whitesmoke";
}
})
.append("title")
.text(d => `${d.name}\n${format(d.value)}`);
node.append("text")
.attr('x', -6)
.attr('y', d => d.dy / 2)
.attr("dy", ".35em")
.attr("text-anchor", "end")
.attr("transform", null)
.text(d => d.name)
.filter(d => d.x < width / 2)
.attr('x', 6 + sankey.nodeWidth())
.attr("text-anchor", "start");
links.style("stroke", (d, i) => {
const gradientID = `gradient${i}`;
const startColor = d.source.color;
const stopColor = d.target.color;
const linearGradient = defs.append("linearGradient")
.attr("id", gradientID);
linearGradient.selectAll("stop")
.data([
{offset: "10%", color: startColor},
{offset: "90%", color: stopColor}
])
.enter().append("stop")
.attr("offset", d => d.offset)
.attr("stop-color", d => d.color);
return `url(#${gradientID})`;
});
};
Disruption Number Date Issued Starting Date Finish Date Status Closure ON FROM TO Impact Duration Details Description Activity Type Traffic District Infrastructure Location
281 May 02 2018 May 19 2018 October 13 2018 Current 104 Street Total Closure 104 Street NW Jasper Avenue NW 103 Avenue NW Total Closure Saturdays 6am - 4pm 104 Street from Jasper Avenue to approximately 50m North of 102 Avenue will be closed Saturdays 6am - 4pm. See attached map. Detour using 105 Street or 103 Street. Downtown Farmers Market Special Event Central Road (53.544606278034074, -113.4992377661625)
401 June 01 2018 June 10 2018 September 30 2018 Current 111 Avenue Lane Reductions 111 Avenue NW 124 Street NW 132 Street NW Travel Delays 4 Months 111 Av from 124 St to 132 St will be reduced to 2 lanes each direction starting on Sunday, June 10th. There will be various sidewalk closures with ped accomodation or detours in place. Motorists can Detour using 118 Av or 107 Av. 111 Avenue Road Rehab Construction Central Road and Sidewalk (53.55889444134047, -113.53589542996733)
38 January 03 2018 January 08 2018 January 01 2020 Current 102 Ave Closure 102 Avenue NW 96 Street NW 103 Street NW Total Closure 2 years Starts Mon Jan 8, 102 Ave from 96 St - 103 St will be closed. Cross traffic at 97 St, 100 St, 101 St & 103 St will be maintained. Detour using Jasper Ave or 103A Ave Valley Line LRT Construction Construction Central Road and Sidewalk (53.54466771586157, -113.48252888413757)
235 April 17 2018 April 23 2018 Current Cloverdale Rd Southbound Permanent Closure Cloverdale Road Connors Road NW 97 Avenue NW Permanent Closure Permanent Closure Southbound SELRT - Starting April 23, the Uphill direction of Cloverdale Hill will be closed permanently. Access from the Cloverdale Community to Connors Road will no longer be possible. Access to the Cloverdale Community FROM Connors Road will remain open. LRT Road Reconfiguration Construction Southeast Road (53.53231468561249, -113.47297597154326)
406 June 04 2018 June 08 2018 September 30 2018 Current WB Whitemud Dr Road Rehabilitation Whitemud Drive Gateway Boulevard Terwillegar Drive Travel Delays 4 Months Starting June 8 at 10pm, Westbound Whitemud Dr will have reduced lane widths and a 60km/hr speed zone in place. On ramps will have reduced capacity and will enter Whitemud Dr under yield conditions. Please reduce speed when travelling through the site. Road Rehabilitation Construction Southwest Road (53.48513037490145, -113.57166766049814)
426 June 06 2018 June 18 2018 July 21 2018 Current 153 Street Watermain Replacement 153 Street NW 90 Avenue NW 91 Avenue NW Total Closure 1 month Traffic on 153 Street, 90 Avenue to 91 Avenue will be totally closed. Detour using meadowlark road & 149 Street. Watermain Replacement Construction Northwest Road and Sidewalk (53.523100255212654, -113.58506464926405)
8 November 02 2016 November 01 2016 December 31 2018 Current 102 St Building Construction Hoarding 102 Street NW 103 Avenue NW 104 Avenue NW Increased Travel Time Long Term Project 102 St from 103 Av to 104 Av will be reduced to one lane in each direction starting Tues, Nov 1 @ 10am for ICE District Stantec Tower and Marriot Hotel construction. Sidewalk on the West side of 102 St, 103 Av - 104 Av is also closed. ICE District Building Const. Construction Central Road and Sidewalk (53.54459341402196, -113.49555525086656)
303 May 08 2018 May 08 2018 May 08 2019 Current SELRT Connors Road Sidewalk Closure Connors Road NW 98 Avenue NW 95 Street NW Travel Delays Long Term Closure The sidewalk on Connors Road will be closed in order to accommodate road and rail work for Valley Line LRT. Follow marked detour route from Trail towards Muttart, to 97 Av east to Cloverdale Hill, and north to Connors Road. SELRT Road and Rail work Construction Central Sidewalk (53.5372586254052, -113.48164745091908)
38 January 03 2018 January 08 2018 January 01 2020 Current 102 Ave Closure 102 Avenue NW 96 Street NW 103 Street NW Total Closure 2 years Starts Mon Jan 8, 102 Ave from 96 St - 103 St will be closed. Cross traffic at 97 St, 100 St, 101 St & 103 St will be maintained. Detour using Jasper Ave or 103A Ave Valley Line LRT Construction Construction Central Road and Sidewalk (53.54301311081867, -113.49740789670487)
25 July 18 2016 July 25 2016 October 31 2018 REVISED 107 Street Total Closure 107 Street NW 105 Avenue NW 106 Avenue NW Total Closure Long Term Projec 107 St, 105 Av - Alley North of 105 Av will be totally closed to traffic starting Mon, July 24 @ 9am for to accommodate drainage tunnel shaft installation. Detour using 106 St or 108 St. Local and emergency access will be maintained. Tunnel Shaft Installation Construction Central Road (53.547768910470666, -113.50475366907331)
207 March 27 2018 April 23 2018 October 01 2018 Current Victoria Trial Reduced to 1 Lane Each Direction Victoria Trail NW 130 Avenue NW Hooke Road Travel Delays 5.5 Months Starting at 9 am on Monday, April 23, until ~ Monday, October 1, Victoria Trail will be reduced to 1 lane in each direction over the Kennedale Ravine. Use 50 Street for detours. Bridge Rehabilitation Construction Northeast Road (53.58933673992949, -113.38568183109695)
394 June 01 2018 June 11 2018 August 24 2018 Current 178 Street Road Rehabilitation Work 178 Street NW 81 Avenue NW 87 Avenue NW Increased Travel Time 3 months Traffic on 178 Street from 81 Avenue to 87 Avenue will be reduced to one lane in each directions. Detour using 170 Street and Anthony Henday Drive. Road Rehabilitation Construction Northwest Road and Sidewalk (53.52128898003489, -113.63046868855544)
396 June 01 2018 June 04 2018 July 01 2018 Current Ozerna Road Closed Ozerna Road NW 163 Avenue NW 165 Avenue NW Total Closure 4 weeks Ozerna Road will be closed from 163 Av to 165 Av starting on Monday, June 4 for approximately 4 weeks. Use 167 Av, 66 St and 82 St for detours. Road Rehabilitation Construction Northeast Road (53.624904358435074, -113.44807162461777)
202 March 23 2018 April 04 2018 September 30 2018 Current 105 Street SB Closure 105 Street NW Jasper Avenue NW 100 Avenue NW Directional Closure 6 Months 105 St SB from Jasper Av to the lane South of Jasper Av will be totally closed starting at 9am on Wed, April 4th for a drainage tunnel shaft. Parking bans will also in in place from Jasper Av to aprox 100m south of Jasper Av on both sides of 105 St. Drainage Shaft Construction Central Road (53.540940868644185, -113.50106756928759)
32 December 24 2015 January 16 2015 December 31 2018 Current 107 St Deep Sewer Const 107 Street NW 111 Avenue NW 110 Avenue NW Total Closure 24 months 107 St, 111 Av - Alley South of 111 Av will be totally closed starting Friday, January 16 @ 9am for approximately 2 years to facilitate drainage deep sewer tunnel shaft installation. Detour using 108 Street. Drainage Tunnel Shaft Install Construction Central Road and Sidewalk (53.55884326278445, -113.50475708908863)
235 April 17 2018 April 23 2018 Current Cloverdale Rd Southbound Permanent Closure Cloverdale Road Connors Road NW 97 Avenue NW Permanent Closure Permanent Closure Southbound SELRT - Starting April 23, the Uphill direction of Cloverdale Hill will be closed permanently. Access from the Cloverdale Community to Connors Road will no longer be possible. Access to the Cloverdale Community FROM Connors Road will remain open. LRT Road Reconfiguration Construction Southeast Road (53.53615710834535, -113.46853907254965)
17 June 09 2016 June 10 2016 October 31 2018 REVISED Hoarding 79 Avenue NW 101 Street NW Increased Travel Time Long Term REVISED END DATE. The sidewalk on the north side of 79 Avenue and the east side of 101 Street will be closed for approximately a half block on 79 Ave and on 101 St and a temporary pedestrian corridor created due to condo construction Building Construction Hoarding Construction Southeast Road and Sidewalk (53.5151716082807, -113.49132561833035)
280 May 02 2018 May 19 2018 October 13 2018 Current 102 Avenue Total Closure 102 Avenue NW 103 Street NW 105 Street NW Total Closure Saturdays 6am - 4pm 102 Avenue from 103 Street to 105 Street closed Saturdays 6am - 4pm. See attached map. Detour using Jasper Avenue or 103 Avenue. Downtown Farmers Market Special Event Central Road (53.54301311081867, -113.49740789670487)
208 March 27 2018 April 18 2018 October 01 2018 Current Reduced to 1 Lane Each Direction Victoria Trail NW 118 Avenue NW Hermitage Road Travel Delays 5.5 Months Starting at 9 am on Wednesday morning, April 18 until ~ Monday, October 1. Victoria Trail will be reduced to 1 lane in each direction over Yellowhead Trail. Detour using 50 Street or Anthony Henday Drive. Bridge Rehabilitation Construction Northeast Road (53.57944631176562, -113.38237996133905)
34 October 04 2017 October 02 2017 April 30 2019 Current 99 St Closure 99 Street NW 102 Avenue NW 102A Avenue NW Total Closure 18 Months 99 St, 102 Ave - 102A Ave & west sidewalk closed due to Valley Line LRT project for 18months. Detour using 97 St or 100 St Valley Line LRT Project Construction Central Road and Sidewalk (53.543471437606314, -113.4889697964992)
394 June 01 2018 June 11 2018 August 24 2018 Current 178 Street Road Rehabilitation Work 178 Street NW 81 Avenue NW 87 Avenue NW Increased Travel Time 3 months Traffic on 178 Street from 81 Avenue to 87 Avenue will be reduced to one lane in each directions. Detour using 170 Street and Anthony Henday Drive. Road Rehabilitation Construction Northwest Road and Sidewalk (53.51489385781888, -113.63008075952452)
23 November 14 2017 November 14 2017 December 02 2018 Current Hoarding Stony Plain Road NW 156 Street NW 157 Street NW Increased Travel Time 12 1/2 Months South side sidewalk will be covered with scaffolding on Stony Plain Road, from 156 Street to 157 Street. Covered Sidewalk Construction Northwest Sidewalk (53.541293190600385, -113.59032624344836)
401 June 01 2018 June 10 2018 September 30 2018 Current 111 Avenue Lane Reductions 111 Avenue NW 124 Street NW 132 Street NW Travel Delays 4 Months 111 Av from 124 St to 132 St will be reduced to 2 lanes each direction starting on Sunday, June 10th. There will be various sidewalk closures with ped accomodation or detours in place. Motorists can Detour using 118 Av or 107 Av. 111 Avenue Road Rehab Construction Central Road and Sidewalk (53.55891772716225, -113.54958853643171)
412 June 05 2018 September 05 2018 October 05 2018 Current 17 Street NE Closed 17 Street NE 121 Avenue NE 127 Avenue NE Total Closure 1 Month 17 Street NE will be closed from 121 Av NE to approx 170m N of 121 Av starting on Wednesday, September 5 for 1 month. Use 121 Av, RR 232, 137 Av, and Aurum Rd for detours. Follow detour route markers. Pipeline Repair Construction Northeast Road (53.584843153992324, -113.31997891931763)
208 March 27 2018 April 18 2018 October 01 2018 Current Reduced to 1 Lane Each Direction Victoria Trail NW 118 Avenue NW Hermitage Road Travel Delays 5.5 Months Starting at 9 am on Wednesday morning, April 18 until ~ Monday, October 1. Victoria Trail will be reduced to 1 lane in each direction over Yellowhead Trail. Detour using 50 Street or Anthony Henday Drive. Bridge Rehabilitation Construction Northeast Road (53.570708652054115, -113.3871483842597)
33 December 24 2015 May 19 2015 December 31 2018 Current 105 Street Northbound Directional Closure 105 Street NW 104 Avenue NW 105 Avenue NW Directional Closure 2.5 Years 105 Street NBD from 104 Avenue to 105 Avenue will be closed to traffic starting Tueday, May 19 @ 9am for approxiamtely 2.5 years to accommodate downtown storm tunnel intensification project. Detour using 109 Street or 101 Street. Drainage Tunneling Project Construction Central Road (53.54621788544202, -113.50107257199707)
373 May 29 2018 June 03 2018 August 26 2018 Current 102 Avenue Total Closure 102 Avenue NW 123 Street NW 124 Street NW Total Closure Sundays 9am - 4pm Sundays Only, June 3rd - August 26th, 2018, 102 Av will be totally closed from 123 St to 124 St including the bike lane from 9am to 4pm. Detour using other routes 124 St Farmers Market Special Event Central Road (53.543016574606035, -113.53412815133146)
421 June 06 2018 June 11 2018 October 31 2018 Current JMT Road Widening James Mowatt Trail Rutherford Road 30 Avenue SW Travel Delays 5 Months Phase 1 - At 9am on June 11, James Mowatt Tr will be restricted to one lane in each direction from north of 26 Ave SW to Rutherford Rd. Left turns will be banned SB from Bowen Wynd - 22 Ave SW and NB from 22 Ave SW - 17 Ave SW. Please use other routes. Road Widening Construction Southwest Road and Sidewalk (53.42102928196522, -113.51662194721017)
6 December 24 2015 August 15 2015 December 31 2018 Current Hoarding 142 Street NW Stony Plain Road Travel Delays 3 1/2 Years Starting on Saturday August 15, 2015, the In House site (Previously know as Glenora Skyline) will erect hoarding to secure the project boundary. This will include a tempoary walk on the east side of 142 Street, north of Stony Plain Road. New Building Construction Northwest Sidewalk (53.54293003877537, -113.56571657487626)
262 April 26 2018 May 07 2018 October 31 2018 Current 231 Street Road Rehabilitation 231 Street NW Secord Road NW Stony Plain Road NW Total Closure 6 Months 231 Street will be closed totally from Secord Road to Stony Plain Road (Hwy 16A). EMSA soccer facility access permitted from South end only. Detour using Winterburn Road (215 St). Road Rehabilitation Construction Northwest Road (53.54134568821769, -113.7135694170039)
29 March 14 2017 March 20 2017 August 31 2018 Current 105 Street Lane Closures 105 Street NW 99 Avenue NW 100 Avenue NW Major Delays Long Term Project 105 St NBD to 100 Av WBD Double Left Turn Closure. Left curb lane closed North of 99 Av. Motorists detour using 109 St or Bellamy Hill. West sidewalk closed from North of 99 Av to 100 Av. Pedestrians detour using East sidewalk. Reduce speed. Stay right. Drainage Tunneling Construction Central Road and Sidewalk (53.53725097616026, -113.50108012512294)
200 March 21 2018 April 23 2018 August 20 2018 Current 17 St NE Closed, 127 Av NE to 137 Av NE 17 Street NE 127 Avenue NE 137 Avenue NE Total Closure 4 Months Starting at 9am on Monday, April 23 until ~ August 20. 17 St NE will be closed from 127 Av NE to 137 Av NE.Use 121 Av NE, Range Road 232 and 137 Av NE for detours. Aurum Rd at 17 St NE will also be closed. Roadway Upgrades Construction Northeast Road (53.584843153992324, -113.31997891931763)
406 June 04 2018 June 08 2018 September 30 2018 Current WB Whitemud Dr Road Rehabilitation Whitemud Drive Gateway Boulevard Terwillegar Drive Travel Delays 4 Months Starting June 8 at 10pm, Westbound Whitemud Dr will have reduced lane widths and a 60km/hr speed zone in place. On ramps will have reduced capacity and will enter Whitemud Dr under yield conditions. Please reduce speed when travelling through the site. Road Rehabilitation Construction Southwest Road (53.48043569908435, -113.49203440868324)
30 December 13 2017 September 14 2017 August 31 2018 Current Total Closure 151 Street 99 Avenue 20m east 99 Avenue Increased Travel Time 1 year Total Closure of 151 Street from 99 Avenue to 20m east of 99 Avenue.Sidewalk remains open to pedestrian traffic on west side of 151 Street. Drainage Construction Construction Northwest Road and Sidewalk (53.53771965324804, -113.58153170799089)
412 June 05 2018 September 05 2018 October 05 2018 Current 17 Street NE Closed 17 Street NE 121 Avenue NE 127 Avenue NE Total Closure 1 Month 17 Street NE will be closed from 121 Av NE to approx 170m N of 121 Av starting on Wednesday, September 5 for 1 month. Use 121 Av, RR 232, 137 Av, and Aurum Rd for detours. Follow detour route markers. Pipeline Repair Construction Northeast Road (53.574163363975536, -113.3199033589168)
207 March 27 2018 April 23 2018 October 01 2018 Current Victoria Trial Reduced to 1 Lane Each Direction Victoria Trail NW 130 Avenue NW Hooke Road Travel Delays 5.5 Months Starting at 9 am on Monday, April 23, until ~ Monday, October 1, Victoria Trail will be reduced to 1 lane in each direction over the Kennedale Ravine. Use 50 Street for detours. Bridge Rehabilitation Construction Northeast Road (53.58387558666639, -113.38366654609338)
205 March 26 2018 April 23 2018 September 30 2020 Current Groat Road Bridge Rehabilitation Groat Road NW 87 Avenue NW Victoria Park Road NW Major Delays 3 Years Traffic on Groat Road from 87 Ave to Victoria Park Rd will be reduced to one lane in each direction due to bridge rehabilitations including Groat Brdg, Emily Murphy Park Rd Brdg and Groat Rd over Vic Park Rd Brdg . The pedestrian path will be maintained. Bridge Rehabilitation Construction Central Road and Sidewalk (53.53935562103989, -113.53741611560739)
7 November 02 2016 November 01 2016 December 31 2018 Current 103 Avenue Lane Reductions 103 Avenue NW 102 Street NW 104 Street NW Increased Travel Time Long Term Project 103 Av, 102 St - 104 St is reduced to one lane in each direction due to ICE District Building Construction. The North sidewalk is also closed. Pedestrians are asked to detour using the South sidewalk. ICE District Building Const. Construction Central Road and Sidewalk (53.54459341402196, -113.49555525086656)
293 May 04 2018 May 09 2018 August 31 2018 Current 113 Av Closed 113 Avenue NW 58 Street NW 60 Street NW Total Closure 4 Months 113 Av will be closed, starting on May 9 until August 31, from 58 St to 60 St for sewer upgrades.Use 112 Av or 118 Av for detours. Sewer Upgrades Construction Northeast Road (53.56845116064235, -113.43070967060088)
262 April 26 2018 May 07 2018 October 31 2018 Current 231 Street Road Rehabilitation 231 Street NW Secord Road NW Stony Plain Road NW Total Closure 6 Months 231 Street will be closed totally from Secord Road to Stony Plain Road (Hwy 16A). EMSA soccer facility access permitted from South end only. Detour using Winterburn Road (215 St). Road Rehabilitation Construction Northwest Road (53.53228336145238, -113.71351707475081)
281 May 02 2018 May 19 2018 October 13 2018 Current 104 Street Total Closure 104 Street NW Jasper Avenue NW 103 Avenue NW Total Closure Saturdays 6am - 4pm 104 Street from Jasper Avenue to approximately 50m North of 102 Avenue will be closed Saturdays 6am - 4pm. See attached map. Detour using 105 Street or 103 Street. Downtown Farmers Market Special Event Central Road (53.54093119792682, -113.4992493670887)
421 June 06 2018 June 11 2018 October 31 2018 Current JMT Road Widening James Mowatt Trail Rutherford Road 30 Avenue SW Travel Delays 5 Months Phase 1 - At 9am on June 11, James Mowatt Tr will be restricted to one lane in each direction from north of 26 Ave SW to Rutherford Rd. Left turns will be banned SB from Bowen Wynd - 22 Ave SW and NB from 22 Ave SW - 17 Ave SW. Please use other routes. Road Widening Construction Southwest Road and Sidewalk (53.40469212384143, -113.53720543758674)
211 April 03 2018 April 30 2018 Current 101 Avenue Permanent Closure 101 Avenue NW Jasper Av NW 96 Street NW Permanent Closure Permanent Closure 101 Av, Jasper Av - 96 St will be permanently closed under a Bylaw closure beginning Monday, April 30. Bylaw Closure Central Road (53.542933838589484, -113.48173118571533)
200 March 21 2018 April 23 2018 August 20 2018 Current 17 St NE Closed, 127 Av NE to 137 Av NE 17 Street NE 127 Avenue NE 137 Avenue NE Total Closure 4 Months Starting at 9am on Monday, April 23 until ~ August 20. 17 St NE will be closed from 127 Av NE to 137 Av NE.Use 121 Av NE, Range Road 232 and 137 Av NE for detours. Aurum Rd at 17 St NE will also be closed. Roadway Upgrades Construction Northeast Road (53.599514405883795, -113.31998028746948)
278 May 01 2018 May 10 2018 October 04 2018 Current 108 Avenue Total closure 108 Avenue NW 123 Street NW 124 Street NW Total Closure Thursdays (2pm - 8pm) Thursdays only, May 10th - October 4th, 2018, 108 Av from 124 St - 123 St will be totally closed from 2pm - 8pm. Detour using other routes. No parking in closure area. 124 Street Farmers Market Special Event Central Road (53.55255354728008, -113.53413289467804)
453 June 13 2018 June 25 2018 August 30 2018 Current 153 Av Sidewalk Closed 153 Avenue NW Beaumaris Road NW 102A Street NW Total Closure 10 Weeks Starting on Monday, June 25 at 9am, the sidewalk on the NS of 153 Av at Beaumaris Rd to approx 100m E will be closed. The right turn bay on the NEC of 153 Av and Beaumaris Rd will also be closed. Follow the pedestrian detour signs to get around. Sewer Installation Construction Northeast Road and Sidewalk (53.61409108036993, -113.50227368309177)
303 May 08 2018 May 08 2018 May 08 2019 Current SELRT Connors Road Sidewalk Closure Connors Road NW 98 Avenue NW 95 Street NW Travel Delays Long Term Closure The sidewalk on Connors Road will be closed in order to accommodate road and rail work for Valley Line LRT. Follow marked detour route from Trail towards Muttart, to 97 Av east to Cloverdale Hill, and north to Connors Road. SELRT Road and Rail work Construction Central Sidewalk (53.53231468561249, -113.47297597154326)
205 March 26 2018 April 23 2018 September 30 2020 Current Groat Road Bridge Rehabilitation Groat Road NW 87 Avenue NW Victoria Park Road NW Major Delays 3 Years Traffic on Groat Road from 87 Ave to Victoria Park Rd will be reduced to one lane in each direction due to bridge rehabilitations including Groat Brdg, Emily Murphy Park Rd Brdg and Groat Rd over Vic Park Rd Brdg . The pedestrian path will be maintained. Bridge Rehabilitation Construction Central Road and Sidewalk (53.52287423218436, -113.54077625911994)
31 June 08 2016 June 13 2016 October 31 2018 REVISED 107 Street Total Closure 107 Street NW 108 Avenue NW 109 Avenue NW Total Closure Long Term Project REVISED END DATE. 107 St, 108 Av - 50m North of 108 Av will be totally closed to accommodate drainage tunnel shaft installation. Detour using 108 St or 106 St. Local and emergency access will be maintained. Drainage Tunnel Install. Construction Central Road (53.55299933175915, -113.50475603178366)
10 July 15 2016 July 18 2016 August 31 2018 REVISED 105 Street Lane Reductions 105 Street NW Jasper Avenue NW 102 Avenue NW Increased Travel Time Long Term Project REVISED END DATE. 105 St, Jasper Av to 100m North of Jasper Av will be reduced to one lane in each direction starting Monday, July 18 @ 9am.. Detour using 109 St or 107 St to avoid travel delays. Mainline Re-route Construction Central Road (53.540940868644185, -113.50106756928759)
391 May 31 2018 May 31 2018 August 31 2020 Current 3.2 Metre Width Reduction Groat Road NW 87 Avenue NW 107 Avenue NW Travel Delays 3 Years Groat Road Bridge and Victoria Park Road have a 3.2 Metre Width Reduction across the bridge decks. The Sidewalk is also very narrow. Please use Caution when driving through this job site, or take an alternate route around the area. Construction - Groat Road Brge Construction Central Road and Sidewalk (53.52287423218436, -113.54077625911994)
391 May 31 2018 May 31 2018 August 31 2020 Current 3.2 Metre Width Reduction Groat Road NW 87 Avenue NW 107 Avenue NW Travel Delays 3 Years Groat Road Bridge and Victoria Park Road have a 3.2 Metre Width Reduction across the bridge decks. The Sidewalk is also very narrow. Please use Caution when driving through this job site, or take an alternate route around the area. Construction - Groat Road Brge Construction Central Road and Sidewalk (53.5509785190086, -113.54970056916223)
465 June 15 2018 June 15 2018 June 30 2018 Current Fort Rd Reduced to 1 Lane SB Fort Road NW 122 Avenue NW 77 Street NW Travel Delays 2 Weeks Fort Rd will be reduced to 1 lane SB from 122 Av to 77 St from June 15 to June 30. Use Wayne Gretzky Dr for detours. Sidewalk Repairs Construction Northeast Road and Sidewalk (53.576726792675665, -113.45923888867796)
467 June 15 2018 June 26 2018 July 10 2018 Current 107 Avenue EB Lane Reduction 107 Avenue NW 127 Street NW 126 Street NW Travel Delays 2 Weeks 107 Av EB from 127 St to 126 St will be reduced to one lane each direction starting at 9am on Tues, June 26th for 2 weeks. Detour using other routes. Waterline Installation Construction Central Road and Sidewalk (53.550963027118016, -113.54117175427542)
265 April 27 2018 June 20 2018 October 31 2018 REVISED 170 St Road Realignment and Urbanization 170 Street SW Ellerslie Road 41 Avenue SW Total Closure 4.5 Months At 9am on June 20, 170 St SW will be closed to traffic from Ellerslie Rd - 41 Ave SW. Local access will be maintained to properties on 170 St SW from the south via 41 Ave SW. There will be a marked detour route using Ellerlie Rd, 141 St SW and 41 Ave SW. Road Realignment/ Urbanization Construction Southwest Road (53.42253501917557, -113.61509947163172)
541 July 09 2018 July 09 2018 July 30 2018 Current 62 St Total Closure 62 Street NW 101 Avenue NW 101 A Avenue NW Total Closure 3 Weeks 62 St closed from 101 Av to 101 A Av for utility repair Utility Repairs Construction Southeast Road (53.54118981947138, -113.42818749596935)
265 April 27 2018 June 20 2018 October 31 2018 REVISED 170 St Road Realignment and Urbanization 170 Street SW Ellerslie Road 41 Avenue SW Total Closure 4.5 Months At 9am on June 20, 170 St SW will be closed to traffic from Ellerslie Rd - 41 Ave SW. Local access will be maintained to properties on 170 St SW from the south via 41 Ave SW. There will be a marked detour route using Ellerlie Rd, 141 St SW and 41 Ave SW. Road Realignment/ Urbanization Construction Southwest Road (53.395728704192976, -113.6146597327138)
171 March 01 2018 March 05 2018 July 31 2018 Current 107 Street Total Closure 107 Street NW 110 Avenue NW 109 Avenue NW Total Closure 3 Months 107 St from the south side of 110 Av to aprox 50 m south of 110 Av will be closed starting Mon, March 5th at 9am. Drainage Tunnel Shaft Construction Central Road (53.55672367944275, -113.50474986581288)
485 June 20 2018 June 23 2018 July 28 2018 Current 99 Avenue Total Closure 99 Avenue NW 106 Street NW 107 Street NW Total Closure Saturdays 7am to 7pm Saturdays Only, 99 Av from 107 St to 106 St will be totally closed from 7am to 7pm June 23rd, June 30th, July 7th, July 21st, July 28th. Concrete Pours / Crane Lifts Construction Central Road (53.537251524750005, -113.50291453459131)
491 June 21 2018 June 25 2018 July 23 2018 Current 82 Av & 85 St Lane Closures 82 Avenue NW 85 Street NW Major Delays 4 Weeks Starting Mon, Jun 25, 85 St, 82 - 83 Av will be reduced to a single lane in each direction, WB 82 Av will be reduced to single lane b/t 9-3pm moving to full time starting Jul 3, and the northwest corner 82 Av/85 St will be closed to pedestrians. Gas Line Repairs Construction Southeast Road and Sidewalk (53.51803285179263, -113.45831882378722)
493 April 27 2018 July 03 2018 August 14 2018 Current 122 Av EB Closed 122 Avenue NW 92 Street NW 82 Street NW Directional Closure 6 Weeks Starting at 9am on Tuesday, July 3, 122 Av, 92 St to 82 St will be closed east bound until August 14. Use 123 Av and 120 Av for detours. Road Rehabilitation Construction Northeast Road (53.57672605056298, -113.46731084143151)
268 April 27 2018 May 07 2018 June 29 2018 REVISED 122 Av Closed from 80 St to Fort Rd 122 Avenue NW 80 Street NW Fort Road NW Total Closure 7 Weeks Starting at 7am on Monday, May 7, 122 Av, 80 St to Fort Rd will be closed until June 8. Use 123 Av and 120 Av for detours. (End date changed to June 29. 7 weeks total) Road Rehabilitation Construction Northeast Road (53.57672625094388, -113.46365965524713)
493 April 27 2018 July 03 2018 August 14 2018 Current 122 Av EB Closed 122 Avenue NW 92 Street NW 82 Street NW Directional Closure 6 Weeks Starting at 9am on Tuesday, July 3, 122 Av, 92 St to 82 St will be closed east bound until August 14. Use 123 Av and 120 Av for detours. Road Rehabilitation Construction Northeast Road (53.5766239019235, -113.48268865471995)
458 April 27 2018 July 03 2018 August 15 2018 Current 122 Av Closed from 80 St to 82 St 122 Avenue NW 80 Street NW 82 Street NW Total Closure 7 Weeks Starting at 9am on Tuesday, July 3, 122 Av, 80 St to 82 St will be closed until August 15. Use 123 Av and 120 Av for detours. (Start date revised from June 27 to July 3) Road Rehabilitation Construction Northeast Road (53.57672625094388, -113.46365965524713)
497 June 22 2018 June 25 2018 August 06 2018 Current Reduced to Single Lane Each Directions 100 Street NW Jasper Avenue NW 103A Avenue NW Increased Travel Time 630pm-6am Nightly Starts Monday June 25 for 6 weeks. 100 St will be reduced to single lane each direction due to LRT Utility work. Detour using other route. Utility Work for VLRT Construction Central Road and Sidewalk (53.5461851090558, -113.49121592865565)
497 June 22 2018 June 25 2018 August 06 2018 Current Reduced to Single Lane Each Directions 100 Street NW Jasper Avenue NW 103A Avenue NW Increased Travel Time 630pm-6am Nightly Starts Monday June 25 for 6 weeks. 100 St will be reduced to single lane each direction due to LRT Utility work. Detour using other route. Utility Work for VLRT Construction Central Road and Sidewalk (53.541154456510235, -113.4902946741834)
503 June 26 2018 June 22 2018 July 13 2018 Current 137 Av Reduced to 1 Lane EB 137 Avenue NW 66 Street NW 61 Street NW Travel Delays 3 weeks 137 Av will be reduced to 1 lane EB from 66 St to 61 St from June 22 to July 13 due to a major subsidence. Use 144 Av, 132 Av and Fort Rd for detours. Subsidence Repair Construction Northeast Road (53.59944362967483, -113.43516848884468)
503 June 26 2018 June 22 2018 July 13 2018 Current 137 Av Reduced to 1 Lane EB 137 Avenue NW 66 Street NW 61 Street NW Travel Delays 3 weeks 137 Av will be reduced to 1 lane EB from 66 St to 61 St from June 22 to July 13 due to a major subsidence. Use 144 Av, 132 Av and Fort Rd for detours. Subsidence Repair Construction Northeast Road (53.59965624208792, -113.4429352160769)
504 June 27 2018 July 21 2018 July 21 2018 Current 120 Street Total Closure 120 Street NW 109A Avenue NW 111 Avenue NW Total Closure Saturday (7am - 1pm) 120 St, 109A Av - 111 Av will be totally closed Saturday, June 21 from 7am to 1pm to accommodate Canadian Celiac Association Gluten Free Breakfast Block Party/Special Event. Detour using 119 Street. Block Party Special Event Central Road (53.55888601130773, -113.52898945362513)
504 June 27 2018 July 21 2018 July 21 2018 Current 120 Street Total Closure 120 Street NW 109A Avenue NW 111 Avenue NW Total Closure Saturday (7am - 1pm) 120 St, 109A Av - 111 Av will be totally closed Saturday, June 21 from 7am to 1pm to accommodate Canadian Celiac Association Gluten Free Breakfast Block Party/Special Event. Detour using 119 Street. Block Party Special Event Central Road (53.55572608652981, -113.52886989466852)
506 June 27 2018 July 03 2018 August 30 2018 Current 76 Ave Total Closure 76 Avenue NW 112 Street NW 114 Street Nw Total Closure 2 Months Starting July 3, 2018 at 9am, 76 Ave from 112 St to 114 St will be closed for a Road Rehabilitation. The Fire Hall and the Businesses will remain open during construction. ETS will be detoured to 72 Ave. Detour using 72 Ave or 82 Ave. Road Rehabilitation Construction Central Road (53.512247021658155, -113.52581455768335)
506 June 27 2018 July 03 2018 August 30 2018 Current 76 Ave Total Closure 76 Avenue NW 112 Street NW 114 Street Nw Total Closure 2 Months Starting July 3, 2018 at 9am, 76 Ave from 112 St to 114 St will be closed for a Road Rehabilitation. The Fire Hall and the Businesses will remain open during construction. ETS will be detoured to 72 Ave. Detour using 72 Ave or 82 Ave. Road Rehabilitation Construction Central Road (53.5122606492498, -113.5199461321977)
508 June 27 2018 July 05 2018 July 29 2018 Current Ellerslie Rd & Gateway Blvd Lane Closures Ellerslie Road SW Gateway Boulevard SW Major Delays 4 Weeks Eastbound Ellerslie Rd SW will be reduced to one lane July 5 - 29th to accommodate pedestrians during construction. Gateway Blvd to Ellerslie Rd SW ramp will be reduced to a single lane off peak hours only July 5 - 12 and full time July 16 - 20 & July 26. Right Turn Improvements Construction Southeast Road and Sidewalk (53.42481625397546, -113.49177106263134)
509 June 27 2018 July 30 2018 July 31 2018 Current Ellerslie Rd & Gateway Blvd Lane Closures Ellerslie Road SW Gateway Boulevard SW Total Closure 2 Days Gateway Blvd off ramp onto Ellerslie Rd SW will be closed for construction Jul 30 and 31 from 9am-3pm. Use 41 Av SW or 23 Av NW. Right Turn Improvements Construction Southeast Road and Sidewalk (53.42481625397546, -113.49177106263134)
514 June 28 2018 July 03 2018 July 17 2018 Current 50 St Reduced to 1 Lane NB 50 Street NW 131 Avenue NW Travel Delays 2 Weeks Starting at 9am on Tuesday, July 3, 50 St will be reduced to 1 lane NB at 131 Av. 131 Av will also be closed EB and WB through the intersection. Use Victoria Tr, Fort Rd and 137 Av for detours. Gas Line Installation Construction Northeast Road (53.592134894063534, -113.4162525460964)
516 June 28 2018 June 27 2018 December 01 2019 Current Hoarding 103 Avenue NW 101 Street NW 102 Street NW Increased Travel Time 18 Months 1)Curb lane closure on 103 Ave EB, 101 St - W of 101 St 2) South sidewalk closure on 103 Ave, 101 St - W of 101 St. Lane configuration has been modified to accommodate hoarding. HSBC Bank Place Revitalization Construction Central Road and Sidewalk (53.544897059634884, -113.49372093739899)
1 September 12 2016 September 15 2016 July 29 2018 Current Hoarding ES of Fort Rd Fort Road NW Belvedere Gate NW Belvedere Way NW Travel Delays 10 Months Covered sidewalk on ES of Fort Road from Belvedere Gate to Belvedere Way for tower crane in construction site. Hoarding Construction Northeast Sidewalk (53.58662388549135, -113.43955599262056)
193 March 15 2018 April 19 2018 July 22 2018 REVISED 170 Street Pedestrian Bridge Rehabilitation 170 Street NW 87 Avenue NW 90 Avenue NW Increased Travel Time 4 Months Traffic on 170 Street from 87 Avenue to 90 Avenue will be reduced to two lanes per direction. Night time, 170 Street will be reduced to one lane in each direction during 9 pm to 6 am intermittently. Detour using Anthony Henday Drive. WEM Pedestrian Bridge Repair Construction Northwest Road and Sidewalk (53.52485931616542, -113.61535568343923)
193 March 15 2018 April 19 2018 July 22 2018 REVISED 170 Street Pedestrian Bridge Rehabilitation 170 Street NW 87 Avenue NW 90 Avenue NW Increased Travel Time 4 Months Traffic on 170 Street from 87 Avenue to 90 Avenue will be reduced to two lanes per direction. Night time, 170 Street will be reduced to one lane in each direction during 9 pm to 6 am intermittently. Detour using Anthony Henday Drive. WEM Pedestrian Bridge Repair Construction Northwest Road and Sidewalk (53.519554472617116, -113.61531596615988)
26 November 28 2017 November 30 2017 July 29 2018 Current 118 Av Reduced to 1 Lane EB 118 Avenue NW 38 Street NW 36 Street NW Travel Delays 8 Months Starting at 9am on Thursday, November 30, 118 Av will be reduced to 1 lane EB from 38 St to 36 St. Use Yellowhead Tr for detours. New Building Construction Construction Northeast Road and Sidewalk (53.570368276236835, -113.399948931577)
386 May 31 2018 June 04 2018 July 08 2018 Current 118 Av Traffic Circle Reduced to 1 Lane 118 Avenue NW 101 Street NW Princess Elizabeth Avenue NW Travel Delays 1.5 Months Until June 22, the Traffic Circle on 118 Av from 101 St to Princess Elizabeth Av will be reduced to 1 lane for 2.5 weeks. Use 97 St and 106 St for detours. The S/W is still Closed until July 8. Curb Ramp Installation Construction Northeast Road (53.57012357273243, -113.49397967051422)
518 June 29 2018 July 03 2018 July 03 2018 Current 118 Av Reduced to 1 Lane WB 118 Avenue NW 68 Street NW 69 Street NW Travel Delays 1 Day (7am to 7pm) 118 Av will be reduced to 1 lane WB from 68 St to 69 St on Tuesday, July 3 from 7am to 7pm. Use 112 Av or Yelllowhead Tr for detours. Concrete Repair Construction Northeast Road (53.570378887859476, -113.44633524924127)
472 June 18 2018 June 20 2018 July 06 2018 REVISED 104 Street Sidewalk Repair 104 Street NW 61 Avenue NW Travel Delays 2 Weeks At 9am on June 20, the right lane of 104 Street will be closed north and south of 61 Avenue to allow for an on street pedestrian detour due to repair work on the south west corner of the intersection. Please keep left to pass the lane closure. Sidewalk Repair Construction Southwest Road and Sidewalk (53.49797331621397, -113.49768162666287)
417 June 06 2018 June 11 2018 November 30 2018 REVISED 122 St Road Rehabilitation 122 Street NW 51 Avenue NW Fox Drive Travel Delays 6 Months *Phase 2 * July 6 at 9am, 122 St will be reduced to one lane each way from north of 51 Ave - Fox Dr. No Left turns permitted for NB from north of 51 Ave - 62 Ave. Left turns will be maintained NB at 63 Ave but banned for SB. All turns maintained at Fox Dr Road Rehabilitation Construction Southwest Road (53.50382118264795, -113.53891270432145)
417 June 06 2018 June 11 2018 November 30 2018 REVISED 122 St Road Rehabilitation 122 Street NW 51 Avenue NW Fox Drive Travel Delays 6 Months *Phase 2 * July 6 at 9am, 122 St will be reduced to one lane each way from north of 51 Ave - Fox Dr. No Left turns permitted for NB from north of 51 Ave - 62 Ave. Left turns will be maintained NB at 63 Ave but banned for SB. All turns maintained at Fox Dr Road Rehabilitation Construction Southwest Road (53.488302411917424, -113.54114061706119)
520 July 04 2018 July 08 2018 September 21 2018 Current Fort Rd Reduced to 1 Lane Each Direction Fort Road NW 66 Street NW 137 Avenue NW Travel Delays 11 Weeks Fort Rd will be reduced to 1 lane in each direction from 66 St to 137 Av, from 8pm to 6pm, starting on Sunday, July 8 until Friday, September 21. Use 50 St and 66 St for detours. Grind and Pave Construction Northeast Road (53.58506182737521, -113.44293369847288)
520 July 04 2018 July 08 2018 September 21 2018 Current Fort Rd Reduced to 1 Lane Each Direction Fort Road NW 66 Street NW 137 Avenue NW Travel Delays 11 Weeks Fort Rd will be reduced to 1 lane in each direction from 66 St to 137 Av, from 8pm to 6pm, starting on Sunday, July 8 until Friday, September 21. Use 50 St and 66 St for detours. Grind and Pave Construction Northeast Road (53.59875812791979, -113.42114647683643)
521 July 04 2018 July 16 2018 July 25 2018 Current Nightly Alternating Directional Closures 66 Street NW 167 Avenue NW 195 Avenue NW Directional Closure 10 Nights 66 St will be closed nightly from 167 Av to 195 Av in alternating directions from 167 Av to 195 Av. Local access will be maintained. Avoid the area and use 97 St and Mannng Dr for detours. Paving Construction Northeast Road (53.6578129633973, -113.43093575072349)
521 July 04 2018 July 16 2018 July 25 2018 Current Nightly Alternating Directional Closures 66 Street NW 167 Avenue NW 195 Avenue NW Directional Closure 10 Nights 66 St will be closed nightly from 167 Av to 195 Av in alternating directions from 167 Av to 195 Av. Local access will be maintained. Avoid the area and use 97 St and Mannng Dr for detours. Paving Construction Northeast Road (53.62864221202404, -113.4428421858877)
522 July 04 2018 July 21 2018 July 29 2018 Current 167 Av Reduced to 1 Lane Each Direction 167 Avenue NW 50 Street NW Manning Drive NW Travel Delays 9 Nights (8pm to 6am) 167 Av, from 50 St to Manning Dr, will be reduced to 1 lane in each direction, from 8pm to 6am, starting on July 21 until July 29. Use Anthony Henday Dr or 153 Av for detours. Grind and Pave Construction Northeast Road (53.62866382157558, -113.4118680936643)
522 July 04 2018 July 21 2018 July 29 2018 Current 167 Av Reduced to 1 Lane Each Direction 167 Avenue NW 50 Street NW Manning Drive NW Travel Delays 9 Nights (8pm to 6am) 167 Av, from 50 St to Manning Dr, will be reduced to 1 lane in each direction, from 8pm to 6am, starting on July 21 until July 29. Use Anthony Henday Dr or 153 Av for detours. Grind and Pave Construction Northeast Road (53.62568844348962, -113.3976045002256)
523 July 04 2018 August 07 2018 August 11 2018 Current 137 Av Reduced to 1 Lane In Each Direction 137 Avenue NW Fort Road NW 50 Street NW Travel Delays 5 Nights (930pm to 6am) 137 Av, from 50 St to Fort Rd, will be reduced to 1 lane in each direction, from 9:30pm to 6am, from August 7 to 11. Use 50 St or Yellowhead Tr for detours. Grind and Pave Construction Northeast Road (53.59875812791979, -113.42114647683643)
523 July 04 2018 August 07 2018 August 11 2018 Current 137 Av Reduced to 1 Lane In Each Direction 137 Avenue NW Fort Road NW 50 Street NW Travel Delays 5 Nights (930pm to 6am) 137 Av, from 50 St to Fort Rd, will be reduced to 1 lane in each direction, from 9:30pm to 6am, from August 7 to 11. Use 50 St or Yellowhead Tr for detours. Grind and Pave Construction Northeast Road (53.59707103817395, -113.41339242580796)
524 July 04 2018 July 18 2018 July 31 2018 Current 153 Av Reduced to 1 Lane in Each Direction 153 Avenue NW Manning Drive NW Fort Road NW Travel Delays 15 Nights (9:30pm to 6am) 153 Av, from Manning Dr to Fort Rd, will be reduced to 1 lane in each direction, from 9:30pm to 6am, from July 18 to July 31. Use 144 Av or 134 Av for detours. Grind and Pave Construction Northeast Road (53.61438825401146, -113.40351968164524)
524 July 04 2018 July 18 2018 July 31 2018 Current 153 Av Reduced to 1 Lane in Each Direction 153 Avenue NW Manning Drive NW Fort Road NW Travel Delays 15 Nights (9:30pm to 6am) 153 Av, from Manning Dr to Fort Rd, will be reduced to 1 lane in each direction, from 9:30pm to 6am, from July 18 to July 31. Use 144 Av or 134 Av for detours. Grind and Pave Construction Northeast Road (53.61547485602165, -113.3916856344501)
528 July 04 2018 July 10 2018 August 08 2018 Current Manning Dr Reduced to 1 Lane Each Way Manning Drive NW 137 Avenue NW 167 Avenue NW Major Delays 4 Weeks (Nights 7pm to 6am) From July 10 to August 8, Manning Dr will be reduced to 1 lane in each direction from 137 Av to 167 Av, starting at 7pm until 6am nightly. Grind and Pave Construction Northeast Road (53.62568844348962, -113.3976045002256)
528 July 04 2018 July 10 2018 August 08 2018 Current Manning Dr Reduced to 1 Lane Each Way Manning Drive NW 137 Avenue NW 167 Avenue NW Major Delays 4 Weeks (Nights 7pm to 6am) From July 10 to August 8, Manning Dr will be reduced to 1 lane in each direction from 137 Av to 167 Av, starting at 7pm until 6am nightly. Grind and Pave Construction Northeast Road (53.598834840417496, -113.42105726026122)
531 July 04 2018 July 04 2018 December 01 2019 Current Hoarding 101 Street NW 102 Avenue NW 103 Avenue NW Increased Travel Time 18 Months 1)Curb lane closure on 101 St SB, 102 Ave - 103 Ave 2) West sidewalk closure on 101St, North of 102 Ave - South of 103 Ave. HSBC Bank Place Revitalization Construction Central Road and Sidewalk (53.543142643273164, -113.4937227220872)
539 July 06 2018 July 09 2018 July 30 2018 Current Reduced to Single Lane Eastbound 103A Avenue NW 95 Street NW 96 Street NW Increased Travel Time 3 Weeks Starts Mon July 9, 103A Ave EB will be reduced to single lane and south sidewalk closed due to sidewalk replacement. Detour using other route. Sidewalk Replacement Construction Central Road and Sidewalk (53.54787734636046, -113.480247194876)
433 June 08 2018 June 13 2018 July 31 2018 Current 104 Street Lane Closures 104 Street NW 76 Avenue NW 73 Avenue NW Major Delays 6 Weeks 104 St will be reduced to 2 lanes from 76 - 73 Avenue beginning Wed, Jun 13 Revised to 6 week duration. Use 109 St or 99 St as alternate routes. 104 Street Water Line Work Construction Southeast Road (53.509265831351, -113.49768071047751)
433 June 08 2018 June 13 2018 July 31 2018 Current 104 Street Lane Closures 104 Street NW 76 Avenue NW 73 Avenue NW Major Delays 6 Weeks 104 St will be reduced to 2 lanes from 76 - 73 Avenue beginning Wed, Jun 13 Revised to 6 week duration. Use 109 St or 99 St as alternate routes. 104 Street Water Line Work Construction Southeast Road (53.51233894124811, -113.49765632440251)
543 July 09 2018 July 16 2018 August 29 2018 Current Ellerslie Rd SW Total Closure Ellerslie Road SW Meridian Street SW 17 Street SW Total Closure 6 Weeks Starting, Mon, Jul 16 Ellerslie Rd SW will be closed from Meridian St to 17 St for complete road rehabilitation project. Road Rehab Construction Southeast Road (53.424892530465996, -113.36830464817434)
543 July 09 2018 July 16 2018 August 29 2018 Current Ellerslie Rd SW Total Closure Ellerslie Road SW Meridian Street SW 17 Street SW Total Closure 6 Weeks Starting, Mon, Jul 16 Ellerslie Rd SW will be closed from Meridian St to 17 St for complete road rehabilitation project. Road Rehab Construction Southeast Road (53.42489045644292, -113.34450152104235)
545 July 09 2018 July 22 2018 July 22 2018 Current Various Road Closures 109 Street NW 97 Avenue NW Sask Drive NW Total Closure 7am - 10am 2018 LuLu Lemon 10K Special Event. Total Closures 1) High Level Bridge 2) 88 Av, 109 St - 110 St 3) Sask Dr, 110 St - Emily Murphy Park Entrance 4) 90 Av, 110 St - 111 St 5) Various Windsor Park Neighborhood Closures. See attached MAP for detailed times. LuLu Lemon 10K Special Event Special Event Central Road (53.534242089786744, -113.50825054508958)
549 July 11 2018 July 13 2018 August 03 2018 Current 111 St Concrete Repair and RT Improvement 111 Street NW Whitemud Drive Travel Delays 3 Weeks Starting at 9am on July 13, the following closures will occur at the intersections of 111 St and Whitemud Dr: The NB right lane and right turn bay , the EB right lane and the WB left lane east of 111 St NB. All turning movements will be maintained. Whitemud Dr Rehab Project Construction Southwest Road and Sidewalk (53.48278419057808, -113.51678917420028)
481 June 20 2018 July 16 2018 September 04 2018 REVISED 106 St Road Rabilitation 106 Street NW 61 Avenue NW 72 Avenue NW Total Closure 2 Months Phase 2. Starting at 9am on July 16, the current 106 St closure from 67 Ave to 70 Ave will be extended north to 72 Ave and south to 61 Ave. ETS, Bicycle and local traffic will be detoured. Please use other routes. Road Rehabilitation Construction Southwest Road and Sidewalk (53.508421431880244, -113.50441593955662)
481 June 20 2018 July 16 2018 September 04 2018 REVISED 106 St Road Rabilitation 106 Street NW 61 Avenue NW 72 Avenue NW Total Closure 2 Months Phase 2. Starting at 9am on July 16, the current 106 St closure from 67 Ave to 70 Ave will be extended north to 72 Ave and south to 61 Ave. ETS, Bicycle and local traffic will be detoured. Please use other routes. Road Rehabilitation Construction Southwest Road and Sidewalk (53.49816803953901, -113.50440879793287)
551 July 11 2018 July 13 2018 September 30 2018 Current 106 Av Lane Closures 106 Avenue NW 67 Street NW 76 Street NW Major Delays 2.5 months Starting Fri, Jul 13 @ 9am 106 Av will be reduced to a single lane in each direction for through traffic. Eastbound 106 Av to northbound Wayne Gretzky Dr. Left Turn will be banned. Use other routes. Road Rehab Construction Southeast Road (53.54934230518843, -113.44456633705362)
551 July 11 2018 July 13 2018 September 30 2018 Current 106 Av Lane Closures 106 Avenue NW 67 Street NW 76 Street NW Major Delays 2.5 months Starting Fri, Jul 13 @ 9am 106 Av will be reduced to a single lane in each direction for through traffic. Eastbound 106 Av to northbound Wayne Gretzky Dr. Left Turn will be banned. Use other routes. Road Rehab Construction Southeast Road (53.5493395792969, -113.43275831777343)
553 July 11 2018 July 11 2018 July 17 2018 Emergency 101 Street Lane Reductions 101 Street NW 111 Avenue NW 110 Avenue NW Increased Travel Time 1 Week 101 St SBD, North of 111 Av - South of 111 Av is reduced to one lane. 111 Av WBD, East of 101 St - West of 101 St reduced to one lane. Emergency watermain break. North side crosswalk at 111 Av/101 St is also closed. Detour using South side crosswalk. Emergency Watermain Break Construction Central Road and Sidewalk (53.55889219611187, -113.4937338324003)
556 July 12 2018 July 13 2018 August 10 2018 Current 199 St Road Urbanization 199 Street NW Grandisle Road Edgemont Boulevard Travel Delays 1 Month On July 13 the following will occur in the 199 St and 23 Ave area: 199 St south of 23 Ave will be shifted to a detour road east of 199 St, 199 St north of 23 Ave will be opened to traffic and the previous 199 St detour road north of 23 Ave will be closed. Road Urbanization Construction Southwest Road (53.43801817553263, -113.66432465837141)
556 July 12 2018 July 13 2018 August 10 2018 Current 199 St Road Urbanization 199 Street NW Grandisle Road Edgemont Boulevard Travel Delays 1 Month On July 13 the following will occur in the 199 St and 23 Ave area: 199 St south of 23 Ave will be shifted to a detour road east of 199 St, 199 St north of 23 Ave will be opened to traffic and the previous 199 St detour road north of 23 Ave will be closed. Road Urbanization Construction Southwest Road (53.46859182096422, -113.66447318042165)
558 July 12 2018 July 16 2018 July 23 2018 Current Westbound Roper Rd Lane Closure Roper Road NW 50 Street NW 54 Street NW Travel Delays 1 Week Westbound Roper Road, 50 - 54 St will be reduced to a single lane full time for one week for water valve work. Use other routes. Water Valve Repair Construction Southeast Road (53.495511180929476, -113.41819218077394)
560 July 12 2018 July 23 2018 July 24 2018 Current Whitemud Drive Lane Closures Whitemud Drive NW 17 Street NW Travel Delays 1 Night 10pm to 6am Whitemud Dr will be reduced to a single lane in each direction for one night Jul 23 10pm to 6am Jul 24. Use other routes. Bridge Washing Construction Southeast Road (53.48206518213646, -113.3687822424978)
561 July 12 2018 July 20 2018 July 20 2018 Current Jasper Av/101 St Total Closures Jasper Avenue NW 100 Street NW 109 Street NW Total Closure 8:30am - 1pm 101 St, Jasper Av - 103 Av aslo totally closed. As per attached MAP. Special Event (KDays Parade) Special Event Central Road (53.541154456510235, -113.4902946741834)
561 July 12 2018 July 20 2018 July 20 2018 Current Jasper Av/101 St Total Closures Jasper Avenue NW 100 Street NW 109 Street NW Total Closure 8:30am - 1pm 101 St, Jasper Av - 103 Av aslo totally closed. As per attached MAP. Special Event (KDays Parade) Special Event Central Road (53.54093917811752, -113.5084386770841)
565 July 13 2018 July 13 2018 July 20 2018 Emergency 118 Avenue sink hole repair 118 Avenue NW 149 Street NW 150 Street NW Increased Travel Time One Week Traffic on Westbound direction of 118 Avenue from 149 Street to 150 Street will be reduced to single lane due to emergency sink hole repair. Detour using 111 Avenue. Roadway repair Construction Northwest Road (53.57041872070606, -113.57801788835275)
566 July 05 2018 July 25 2018 July 26 2018 Current Groat Road Southbound Closure Groat Road NW Victoria Park Road NW River Valley Road NW Directional Closure Night closure (10pm - 5am) Groat Rd SB will be closed overtop of Victoria P Rd Bridge. Victoria P Rd WB to Groat Rd SB and River V Rd EB will be closed. Groat Rd SB to River V Rd EB will remain open. River V Rd WBD to Groat Rd SB will remain open. Bridge Construction Construction Northwest Road (53.53935562103989, -113.53741611560739)
567 July 05 2018 July 20 2018 July 21 2018 Current Victoria Park Road WBD to Groat SBD construction Victoria Park Road NW Groat Road NW Directional Closure Night closure (10pm - 5am) Victoria Park Road WBD to Groat Road SBD and River Valley Road EBD will be closed. Groat Road SBD to River Valley Road EBD will remain open. River Valley Road WBD to Groat Road SBD will remain open. Bridge Construction Construction Northwest Road (53.53935562103989, -113.53741611560739)
538 July 06 2018 July 17 2018 July 19 2018 REVISED 30 Ave SW Grinding and Paving 30 Avenue SW Allard Link 111 Street SW Total Closure 3 Days (9am - 3pm) Starting at 9am on July 17, 18 and 19, 30 Ave SW will be closed to traffic from Allard Link to 111 St SW until 3pm for road paving. Please detour using Ellerslie Rd or 41 Ave SW. Grinding and Paving Construction Southwest Road (53.404660848505856, -113.52160116485481)
538 July 06 2018 July 17 2018 July 19 2018 REVISED 30 Ave SW Grinding and Paving 30 Avenue SW Allard Link 111 Street SW Total Closure 3 Days (9am - 3pm) Starting at 9am on July 17, 18 and 19, 30 Ave SW will be closed to traffic from Allard Link to 111 St SW until 3pm for road paving. Please detour using Ellerslie Rd or 41 Ave SW. Grinding and Paving Construction Southwest Road (53.40734232818376, -113.51532179780374)
569 July 15 2018 July 16 2018 July 17 2018 REVISED Dawson Bridge Closed Rowland Road NW 87 Street NW 84 Street NW Total Closure 2 Days Dawson Bridge will be closed from Monday, July 16 starting at 1030am until 6am on Wednesday, July 18 due to emergency water main break repairs. Use 98 Av or 112 Av for detours. (Start date and time revised, completion time added) Water Main Break Construction Central Road (53.54936441494053, -113.45710449697432)
569 July 15 2018 July 16 2018 July 17 2018 REVISED Dawson Bridge Closed Rowland Road NW 87 Street NW 84 Street NW Total Closure 2 Days Dawson Bridge will be closed from Monday, July 16 starting at 1030am until 6am on Wednesday, July 18 due to emergency water main break repairs. Use 98 Av or 112 Av for detours. (Start date and time revised, completion time added) Water Main Break Construction Central Road (53.548280078550555, -113.46916132718668)
572 July 16 2018 July 23 2018 October 30 2018 Current 111 Avenue Road Construction 111 Avenue NW 142 Street NW 149 Street NW Increased Travel Time 3 Months Traffic on 111 Avenue from 142 Street to 149 Street will be reduced to single lane due to road construction. Detour using 107 Avenue and Yellowhead Trail. Road Construction Construction Northwest Road and Sidewalk (53.558897550328254, -113.57807459215901)
573 July 16 2018 July 23 2018 August 17 2018 Current 118 Avenue Watermain Construction 118 Avenue NW 127 Street NW 128 Street NW Increased Travel Time 4 Weeks Traffic on 118 Avenue, 127 Street to 128 Street will be reduced to one lane Westbound and two lanes Eastbound. Detour using 107 Avenue and Yellowhead trail. Watermain construction Construction Northwest Road (53.570323799722665, -113.54117052237476)
572 July 16 2018 July 23 2018 October 30 2018 Current 111 Avenue Road Construction 111 Avenue NW 142 Street NW 149 Street NW Increased Travel Time 3 Months Traffic on 111 Avenue from 142 Street to 149 Street will be reduced to single lane due to road construction. Detour using 107 Avenue and Yellowhead Trail. Road Construction Construction Northwest Road and Sidewalk (53.55889471081128, -113.56576346677667)
562 July 12 2018 July 17 2018 July 21 2018 REVISED Manning Dr Closed NB Manning Drive NW 137 Avenue NW 167 Avenue NW Directional Closure 5 Nights (10pm to 6am) Manning Dr NB Closed: July 17, 137 Av to 50 St; July 18, 50 St to 144 Av; July 19, 144 Av to 153 Av; July 20 & 21, 153 Av to 167 Av. Use other routes. (Dates Revised. Starting July 17 rather than July 13) Paving Construction Northeast Road (53.598834840417496, -113.42105726026122)
562 July 12 2018 July 17 2018 July 21 2018 REVISED Manning Dr Closed NB Manning Drive NW 137 Avenue NW 167 Avenue NW Directional Closure 5 Nights (10pm to 6am) Manning Dr NB Closed: July 17, 137 Av to 50 St; July 18, 50 St to 144 Av; July 19, 144 Av to 153 Av; July 20 & 21, 153 Av to 167 Av. Use other routes. (Dates Revised. Starting July 17 rather than July 13) Paving Construction Northeast Road (53.62568844348962, -113.3976045002256)
540 January 03 2018 July 10 2018 July 27 2018 REVISED Reduced to Single Lane Each Direction 104 Avenue NW 102 Street NW 104 Street NW Increased Travel Time 1 Week Starts Tues. July 10 at 10am for 1 week, 104 Ave, 102 St - 104 St will be reduced to single lane each direction. Detour using other route. Drainage Work Construction Central Road (53.54617454103664, -113.49555613988215)
519 July 03 2018 July 03 2018 July 27 2018 Current 102 Street Total Closure 102 Street NW 103 Avenue NW 104 Avenue NW Total Closure Tues - Fri (6pm - 6am) 102 St, North of 103 Av to 104 Av will be totally closed from 6pm to 6am to accommodate pedway construction. Local and parkade access will be maintained. Detour using 101 St or 104 St. Pedway Construction Construction Central Road (53.54459341402196, -113.49555525086656)
9 February 22 2017 March 01 2017 December 31 2018 REVISED SELRT Bridge Construction Whitemud Drive NW 66 Street NW Travel Delays 22 Months REVISED END DATE. Whitemud Drive at 66 Street will have the inside lane closed eastbound and westbound to construct the Valley Line LRT Bridge. Traffic is encouraged to stay right or detour using 34 Avenue Bridge Construction Construction Southeast Road (53.48508931430974, -113.44266040279611)
577 July 17 2018 July 21 2018 July 23 2018 Current WB Whitemud Dr Rehab Whitemud Drive 99 Street NW Terwillegar Drive Travel Delays 2 Days Starting at 6am on July 21, Whitemud Dr Westbound will be reduced to 2 lanes from 99 St - Rainbow Valley Bridge until 8pm. At 8pm the lane closure will be partially removed and only remain from 122 St to Rainbow Valley Bridge until 6am July 23. Whitemud Dr Rehab Project Construction Southwest Road (53.48039610508215, -113.48609705624474)
577 July 17 2018 July 21 2018 July 23 2018 Current WB Whitemud Dr Rehab Whitemud Drive 99 Street NW Terwillegar Drive Travel Delays 2 Days Starting at 6am on July 21, Whitemud Dr Westbound will be reduced to 2 lanes from 99 St - Rainbow Valley Bridge until 8pm. At 8pm the lane closure will be partially removed and only remain from 122 St to Rainbow Valley Bridge until 6am July 23. Whitemud Dr Rehab Project Construction Southwest Road (53.48513037490145, -113.57166766049814)
578 July 17 2018 July 23 2018 August 03 2018 Current Whitemud Dr WB Grind and Pave Whitemud Drive 99 Street NW Terwillegar Drive Travel Delays 2 Weeks (10pm - 6am) ** Phase 1 ** Starting at 10pm on July 23, Westbound Whitemud Drive will be reduced to one lane nightly from east of 99 Street - west of Rainbow Valley Bridge until 6am the following day. Please keep right to pass the lane closures. Whitemud Dr WB Grind and Pave Construction Southwest Road (53.48513037490145, -113.57166766049814)
578 July 17 2018 July 23 2018 August 03 2018 Current Whitemud Dr WB Grind and Pave Whitemud Drive 99 Street NW Terwillegar Drive Travel Delays 2 Weeks (10pm - 6am) ** Phase 1 ** Starting at 10pm on July 23, Westbound Whitemud Drive will be reduced to one lane nightly from east of 99 Street - west of Rainbow Valley Bridge until 6am the following day. Please keep right to pass the lane closures. Whitemud Dr WB Grind and Pave Construction Southwest Road (53.48039610508215, -113.48609705624474)
579 July 17 2018 July 20 2018 August 24 2018 Current Whitemud Dr EB C-D Road Closure Whitemud Drive 106 Street NW Total Closure 5 Weeks Starting at 9am on July 20, the EB Whitemud Drive C-D road that connects 106 St to Calgary Tr will be closed. There will be single lane closures NB and EB approaching the intersection. Please use 111 St to Whitemud Dr EB or Calgary Tr via 51 Ave to detour Whitemud Dr Rehabilitation Construction Southwest Road and Sidewalk (53.48140269837642, -113.50426859720967)
544 July 09 2018 July 25 2018 August 15 2018 Current 64 Av Total Closure 64 Avenue NW 104 Street 105 Street NW Total Closure 3 Weeks Starting Wed, Jul 25 at 9am, 64 Av will be closed from 104 St to the alley west. Use other routes. Utility Repairs Construction Road (53.50074175138267, -113.49768368971239)
542 July 09 2018 July 25 2018 August 15 2018 Current 104 Street Lane Closures 104 Street NW 65 Avenue NW 63 Avenue NW Major Delays 3 Weeks Starting Weds, Jul 25 at 9am, 104 St will be reduced to two lanes from 65 - 63 Av. Expect Major Delays. Use other routes. Utility Repairs Construction Road (53.50159914143773, -113.49768274849035)
581 July 18 2018 July 18 2018 July 23 2018 Current 115 Ave Closure 115 Avenue NW 91 Street NW 94 Street NW Total Closure 5 Days 115 Ave, 91 St - 94 St closed due to waterline installation. Detour using other route. Waterline Installation Construction Central Road and Sidewalk (53.56581669629031, -113.4811871749676)
582 July 18 2018 July 18 2018 July 20 2018 Current 103 Avenue Total Closure 103 Avenue NW 102 Street NW 103 Street NW Total Closure 630pm to 6am Nightly 103 Ave, 102 St - 103 St closed on July 18 - 20 from 630pm to 6am nightly due to fibre optic installation. Detour using other route. Fibre Optic Installation Construction Central Road (53.54459458056498, -113.49738914959538)
515 June 28 2018 July 03 2018 July 27 2018 Current 102 St SB Closure 102 Street NW 103 Avenue NW 104 Avenue NW Directional Closure Starts Tues. July 3 at 9am, 102 St SB from 104 Ave to alley south of 104 Ave will be closed due to drainage work. Parkade access via 103 Ave - 102 St. Drainage Work Construction Central Road (53.54459341402196, -113.49555525086656)
22 December 15 2017 December 19 2017 July 20 2018 REVISED BMO Building Demo 101 Street NW 101A Avenue NW 102 Avenue NW Increased Travel Time 1) Curb lane & east sidewalk closure 101 St NB, 102 Av to lane S of 102 Ave 2) South sidewalk closure on 102 Av, 100A St - 101 St 3) West sidewalk closure on 100A St, 102 Av to lane S of 102 Ave 4) Staged closure of alley S of 102 Av, 100A St - 101 St. Hoarding Construction Central Road and Sidewalk (53.543142643273164, -113.4937227220872)
583 July 18 2018 July 16 2018 August 17 2018 Current Whitemud Speed Reduction Whitemud Drive NW 170 Street NW Anthony Henday Drive NW Increased Travel Time One Month Speed reduction to Max 60km/h will be in effect on Whitemud Drive from Anthony Henday Drive to 170 Street due to concrete median barrier replacement. Concrete Jersey Barrier work Construction Northwest Road (53.51222473779908, -113.65849616827272)
583 July 18 2018 July 16 2018 August 17 2018 Current Whitemud Speed Reduction Whitemud Drive NW 170 Street NW Anthony Henday Drive NW Increased Travel Time One Month Speed reduction to Max 60km/h will be in effect on Whitemud Drive from Anthony Henday Drive to 170 Street due to concrete median barrier replacement. Concrete Jersey Barrier work Construction Northwest Road (53.51210175552203, -113.61533691019326)
584 July 18 2018 July 18 2018 August 01 2018 Current 82 St SB R Turn Bay to YHT WB Closure 82 Street NW Yellowhead Trail NW Directional Closure 2 Weeks Starting on July 18, the right turn bay from SB 82 St to WB YHT will be closed due to a large subsidence. Once the repairs have been completed the closure will be removed. Emergency Subsidence Repair Construction Northeast Road (53.5821690342696, -113.46733154624384)
27 February 13 2017 February 13 2017 August 31 2018 Current Covered walk at 105 St and 82 Ave 105 Street NW 81 Avenue NW 82 Avenue NW Travel Delays 1.5 years Covered walk and parking lane closure East side 105 St Lane S of 82 Av to 82 Av. Covered walk on South Side 82 Av from 105 to to East of 105 St. Pedestrians can detour via West side of 105 St & north side 82 Ave. Building Construction Construction Southeast Road and Sidewalk (53.517080484870135, -113.50046426730667)
510 June 04 2018 July 09 2018 July 19 2018 REVISED 127 Street Paving 127 Street NW 158 Avenue NW 167 Avenue NW Travel Delays 10 days (9am - 3pm) Traffic on 127 Street will be split to East Side from 167 Avenue to 158 Avenue. Detour using 142 Street & Castledowns Road. Paving Construction Northwest Road (53.6203064331923, -113.54120159583825)
510 June 04 2018 July 09 2018 July 19 2018 REVISED 127 Street Paving 127 Street NW 158 Avenue NW 167 Avenue NW Travel Delays 10 days (9am - 3pm) Traffic on 127 Street will be split to East Side from 167 Avenue to 158 Avenue. Detour using 142 Street & Castledowns Road. Paving Construction Northwest Road (53.628762102438436, -113.54123155203588)
585 July 18 2018 July 14 2018 August 01 2018 Current 99 Avenue Total Closure 99 Avenue NW 109 Street 107 Street Total Closure Approx 2 Weeks 99 Av, 107 St - Alley East of 107 St Festival Closure for Taste Of Edmonton Special Event. Detour using 100 Av. Taste Of Edmonton Event Special Event Central Road (53.537256418374724, -113.50843103552523)
586 July 18 2018 July 18 2018 July 23 2018 Current Reduced to one lane 90 Avenue NW 75 Street NW 76 Street NW Travel Delays 5 Days Starting July 18, 90 Ave W/B will be reduced to one lane from 75 St to 76 St for Emergency Hydrant Repair. Use other routes. Emergency Hydrant Repair Construction Southeast Road (53.525231602066405, -113.44290760997328)
588 July 18 2018 July 18 2018 July 20 2018 Current One lane Closed N/B & S/B 109 Street NW 81 Avenue NW 82 Avenue NW Travel Delays 2 Days The inside lanes both N/B and S/B on 109 St from 81 Ave to 82 Ave will be closed as well as the 109 St N/B to W/B 82 Ave turn bay, due to a water main break. Use other routes. Water Main Break Construction Central Road (53.517103593206926, -113.51204422529558)
587 July 18 2018 July 16 2018 July 22 2018 Current 122 Av Closed 122 Avenue NW 127 Street NW 125 Street NW Total Closure 7 Days 122 Av, from 127 St to 125 St will be closed from Monday, July 16 until Friday, Sunday, July 22. Use 123 or 121 Av for detours. (Duration revised to 7 days) Road Rehabilitation Construction Northeast Road (53.57668779553476, -113.54118933902883)
580 July 17 2018 July 19 2018 July 22 2018 REVISED 66 Street Closed 66 Street NW Anthony Henday Drive 170 Avenue NW Directional Closure 4 Nights 66 Street will be closed NB for 2 nights from 7pm to 6am on July 19 & 20 and SB for two nights on July 21 & 22. Use 97 St, Manning Dr, or 153 Av for detours from the Anthony Henday. (dates revised, NB and SB for one night.) Paving Construction Northeast Road (53.632286748264576, -113.44280379691408)
580 July 17 2018 July 19 2018 July 22 2018 REVISED 66 Street Closed 66 Street NW Anthony Henday Drive 170 Avenue NW Directional Closure 4 Nights 66 Street will be closed NB for 2 nights from 7pm to 6am on July 19 & 20 and SB for two nights on July 21 & 22. Use 97 St, Manning Dr, or 153 Av for detours from the Anthony Henday. (dates revised, NB and SB for one night.) Paving Construction Northeast Road (53.64701960703178, -113.43902885435031)
589 July 19 2018 July 13 2018 July 27 2018 Current 99 Street Lane Closure 99 Street NW 47 Avenue NW 45 Avenue NW Major Delays 2 Weeks Southbound 99 Street is reduced to a single lane at 45 Av due to a heave in the road. Use other routes. Heave Construction Southeast Road (53.48477663206405, -113.48610850244009)
590 July 19 2018 July 25 2018 August 10 2018 Current Split to the North Side of 87 Ave 87 Avenue Nw 116 Street NW 117 Street NW Travel Delays 2.5 Weeks Starting Wednesday July 25 at 9am, 87 Ave from 116 St to 117 St will be split to the Northside for approximately 2.5 weeks. Use other routes. Waterline Installation Construction Central Road (53.5229444876343, -113.53063018191627)
591 July 19 2018 July 19 2018 July 26 2018 Current 97 Avenue Lane Reductions 97 Avenue NW 104 Street NW 105 Street NW Increased Travel Time 1 Week 97 Av WBD, 104 St - 105 St reduced to one lane. 97 Av EBD, 105 St - 104 St reduced to two lanes. Emergency watermain break. Emergency Watermain Break Construction Central Road (53.534015905085525, -113.49894600586984)
592 July 20 2018 July 20 2018 July 23 2018 Current 66 St Directional Closure 66 Street NW 167 Avenue NW Anthony Henday Drive Travel Delays 4 days 66 St northbound directional closure for 4 days for emergency manhole repairs. 66 St from 167 Av to Anthony Henday Drive Emergency Manhole Repairs Construction Northeast Road (53.64701960703178, -113.43902885435031)
592 July 20 2018 July 20 2018 July 23 2018 Current 66 St Directional Closure 66 Street NW 167 Avenue NW Anthony Henday Drive Travel Delays 4 days 66 St northbound directional closure for 4 days for emergency manhole repairs. 66 St from 167 Av to Anthony Henday Drive Emergency Manhole Repairs Construction Northeast Road (53.62864221202404, -113.4428421858877)
593 July 20 2018 July 20 2018 July 24 2018 Emergency 106 Street NB Closure 106 Street NW 100 Avenue NW Jasper Avenue NW Directional Closure 5 Days 106 Street NB from 100 Av to Jasper Av is closed due to a road subsidence. Access to 106 St is maintained from Jasper Av. Road Subsidence Construction Central Road (53.538835001163775, -113.50292151667023)
596 July 23 2018 July 28 2018 July 28 2018 Current Groat Road Total Closure Groat Road NW 87 Avenue NW River Valley Road NW Total Closure Sat (8am - 2:30pm) Groat Rd from 87 Av - River Valley Rd closed 8am - 2:30pm. Note closure includes Emily Murphy Park Road/Mayfair Overpass/Hawrelak Park Entrance and Saskatchewan Dr, 87 Av - 110 St. See attached map. Additional info at: http://edmonton.triathlon.org ITU Triahtlon Special Event Special Event Central Road (53.53814512581992, -113.53710187564764)
595 July 23 2018 July 27 2018 July 28 2018 Current Saskatchewan Drive NW Saskatchewan Drive NW 116 Street NW Emily Murphy Park Road NW Total Closure Fri (12-8pm) Sat (2:30-5:30pm) Note closure includes Emily Murphy Park Road /Mayfair Overpass from East of 116 Street to Hawrelak Park. See attached map. Additional info at: http://edmonton.triathlon.org ITU Triathlon Special Event Special Event Central Road (53.530844145169176, -113.53071379131065)
596 July 23 2018 July 28 2018 July 28 2018 Current Groat Road Total Closure Groat Road NW 87 Avenue NW River Valley Road NW Total Closure Sat (8am - 2:30pm) Groat Rd from 87 Av - River Valley Rd closed 8am - 2:30pm. Note closure includes Emily Murphy Park Road/Mayfair Overpass/Hawrelak Park Entrance and Saskatchewan Dr, 87 Av - 110 St. See attached map. Additional info at: http://edmonton.triathlon.org ITU Triahtlon Special Event Special Event Central Road (53.52287423218436, -113.54077625911994)
594 July 23 2018 July 28 2018 July 28 2018 Current Saskatchewan Drive NW Saskatchewan Drive NW 110 Street NW 87 Avenue NW Total Closure Saturday (8am - 2:30pm) Note closure includes Emily Murphy Park Rd /Mayfair Overpass from 116 Street to Hawrelak Park. Groat Rd, 87 Av - River Valley Rd. See attached map. Additional info at: http://edmonton.triathlon.org. ITU Triathlon Special Event Special Event Central Road (53.52279655736342, -113.5406557644051)
594 July 23 2018 July 28 2018 July 28 2018 Current Saskatchewan Drive NW Saskatchewan Drive NW 110 Street NW 87 Avenue NW Total Closure Saturday (8am - 2:30pm) Note closure includes Emily Murphy Park Rd /Mayfair Overpass from 116 Street to Hawrelak Park. Groat Rd, 87 Av - River Valley Rd. See attached map. Additional info at: http://edmonton.triathlon.org. ITU Triathlon Special Event Special Event Central Road (53.52574821937133, -113.51501446147144)
597 July 23 2018 July 25 2018 July 31 2018 Current 109 Street NB Lane Reduction 109 Street NW 110 Street NW Kingsway Travel Delays 1 Week 109 Street NB, 110 Av - Kingsway will be reduced to one lane NB starting on Wed, July 25th. The East sidewalk will also be closed. Emergency Hydrant Repair Construction Central Road and Sidewalk (53.5608193020673, -113.50842180689861)
598 July 23 2018 July 23 2018 July 23 2018 Current 15 min closure of Ellerslie Road SW westbound ELLERSLIE ROAD SW 101 STREET SW GATEWAY BOULEVARD SW Total Closure 15 minutes Ellerslie Road SW westbound, between 101 St and Gateway Boulevard will be closed for 15 minutes between the hours of 7:00 pm to 11:00 pm for overhead sign maintenance. Overhead Sign Maintenance Construction Southeast Road (53.424817826093815, -113.48918883561413)