Flow order for sankey is as follows:
Disruptions → Status → Impact → Activity Type → Traffic District → Infrastructure
Last active
August 11, 2018 00:09
-
-
Save mikelotis/98000626c7332958b47fe4f4fc0cf4fc to your computer and use it in GitHub Desktop.
Edmonton - Traffic Disruption (Sankey)
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
border: yes | |
width: 984 | |
height: 660 |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
d3.sankey = function() { | |
var sankey = {}, | |
nodeWidth = 24, | |
nodePadding = 8, | |
size = [1, 1], | |
nodes = [], | |
links = []; | |
sankey.nodeWidth = function(_) { | |
if (!arguments.length) return nodeWidth; | |
nodeWidth = +_; | |
return sankey; | |
}; | |
sankey.nodePadding = function(_) { | |
if (!arguments.length) return nodePadding; | |
nodePadding = +_; | |
return sankey; | |
}; | |
sankey.nodes = function(_) { | |
if (!arguments.length) return nodes; | |
nodes = _; | |
return sankey; | |
}; | |
sankey.links = function(_) { | |
if (!arguments.length) return links; | |
links = _; | |
return sankey; | |
}; | |
sankey.size = function(_) { | |
if (!arguments.length) return size; | |
size = _; | |
return sankey; | |
}; | |
sankey.layout = function(iterations) { | |
computeNodeLinks(); | |
computeNodeValues(); | |
computeNodeBreadths(); | |
computeNodeDepths(iterations); | |
computeLinkDepths(); | |
return sankey; | |
}; | |
sankey.relayout = function() { | |
computeLinkDepths(); | |
return sankey; | |
}; | |
sankey.link = function() { | |
var curvature = .5; | |
function link(d) { | |
var x0 = d.source.x + d.source.dx, | |
x1 = d.target.x, | |
xi = d3.interpolateNumber(x0, x1), | |
x2 = xi(curvature), | |
x3 = xi(1 - curvature), | |
// prevent a perfectly straight path | |
// to avoid missing SVG path gradient bug in Chromium and mozilla | |
// minus 1.0 from y0 | |
y0 = (d.source.y + d.sy + d.dy / 2) - 1.0, | |
y1 = d.target.y + d.ty + d.dy / 2; | |
return "M" + x0 + "," + y0 | |
+ "C" + x2 + "," + y0 | |
+ " " + x3 + "," + y1 | |
+ " " + x1 + "," + y1; | |
} | |
link.curvature = function(_) { | |
if (!arguments.length) return curvature; | |
curvature = +_; | |
return link; | |
}; | |
return link; | |
}; | |
// Populate the sourceLinks and targetLinks for each node. | |
// Also, if the source and target are not objects, assume they are indices. | |
function computeNodeLinks() { | |
nodes.forEach(function(node) { | |
node.sourceLinks = []; | |
node.targetLinks = []; | |
}); | |
links.forEach(function(link) { | |
var source = link.source, | |
target = link.target; | |
if (typeof source === "number") source = link.source = nodes[link.source]; | |
if (typeof target === "number") target = link.target = nodes[link.target]; | |
source.sourceLinks.push(link); | |
target.targetLinks.push(link); | |
}); | |
} | |
// Compute the value (size) of each node by summing the associated links. | |
function computeNodeValues() { | |
nodes.forEach(function(node) { | |
node.value = Math.max( | |
d3.sum(node.sourceLinks, value), | |
d3.sum(node.targetLinks, value) | |
); | |
}); | |
} | |
// Iteratively assign the breadth (x-position) for each node. | |
// Nodes are assigned the maximum breadth of incoming neighbors plus one; | |
// nodes with no incoming links are assigned breadth zero, while | |
// nodes with no outgoing links are assigned the maximum breadth. | |
function computeNodeBreadths() { | |
var remainingNodes = nodes, | |
nextNodes, | |
x = 0; | |
while (remainingNodes.length) { | |
nextNodes = []; | |
remainingNodes.forEach(function(node) { | |
node.x = x; | |
node.dx = nodeWidth; | |
node.sourceLinks.forEach(function(link) { | |
if (nextNodes.indexOf(link.target) < 0) { | |
nextNodes.push(link.target); | |
} | |
}); | |
}); | |
remainingNodes = nextNodes; | |
++x; | |
} | |
// | |
moveSinksRight(x); | |
scaleNodeBreadths((size[0] - nodeWidth) / (x - 1)); | |
} | |
function moveSourcesRight() { | |
nodes.forEach(function(node) { | |
if (!node.targetLinks.length) { | |
node.x = d3.min(node.sourceLinks, function(d) { return d.target.x; }) - 1; | |
} | |
}); | |
} | |
function moveSinksRight(x) { | |
nodes.forEach(function(node) { | |
if (!node.sourceLinks.length) { | |
node.x = x - 1; | |
} | |
}); | |
} | |
function scaleNodeBreadths(kx) { | |
nodes.forEach(function(node) { | |
node.x *= kx; | |
}); | |
} | |
function computeNodeDepths(iterations) { | |
var nodesByBreadth = d3.nest() | |
.key(function(d) { return d.x; }) | |
.sortKeys(d3.ascending) | |
.entries(nodes) | |
.map(function(d) { return d.values; }); | |
// | |
initializeNodeDepth(); | |
resolveCollisions(); | |
for (var alpha = 1; iterations > 0; --iterations) { | |
relaxRightToLeft(alpha *= .99); | |
resolveCollisions(); | |
relaxLeftToRight(alpha); | |
resolveCollisions(); | |
} | |
function initializeNodeDepth() { | |
var ky = d3.min(nodesByBreadth, function(nodes) { | |
return (size[1] - (nodes.length - 1) * nodePadding) / d3.sum(nodes, value); | |
}); | |
nodesByBreadth.forEach(function(nodes) { | |
nodes.forEach(function(node, i) { | |
node.y = i; | |
node.dy = node.value * ky; | |
}); | |
}); | |
links.forEach(function(link) { | |
link.dy = link.value * ky; | |
}); | |
} | |
function relaxLeftToRight(alpha) { | |
nodesByBreadth.forEach(function(nodes, breadth) { | |
nodes.forEach(function(node) { | |
if (node.targetLinks.length) { | |
var y = d3.sum(node.targetLinks, weightedSource) / d3.sum(node.targetLinks, value); | |
node.y += (y - center(node)) * alpha; | |
} | |
}); | |
}); | |
function weightedSource(link) { | |
return center(link.source) * link.value; | |
} | |
} | |
function relaxRightToLeft(alpha) { | |
nodesByBreadth.slice().reverse().forEach(function(nodes) { | |
nodes.forEach(function(node) { | |
if (node.sourceLinks.length) { | |
var y = d3.sum(node.sourceLinks, weightedTarget) / d3.sum(node.sourceLinks, value); | |
node.y += (y - center(node)) * alpha; | |
} | |
}); | |
}); | |
function weightedTarget(link) { | |
return center(link.target) * link.value; | |
} | |
} | |
function resolveCollisions() { | |
nodesByBreadth.forEach(function(nodes) { | |
var node, | |
dy, | |
y0 = 0, | |
n = nodes.length, | |
i; | |
// Push any overlapping nodes down. | |
nodes.sort(ascendingDepth); | |
for (i = 0; i < n; ++i) { | |
node = nodes[i]; | |
dy = y0 - node.y; | |
if (dy > 0) node.y += dy; | |
y0 = node.y + node.dy + nodePadding; | |
} | |
// If the bottommost node goes outside the bounds, push it back up. | |
dy = y0 - nodePadding - size[1]; | |
if (dy > 0) { | |
y0 = node.y -= dy; | |
// Push any overlapping nodes back up. | |
for (i = n - 2; i >= 0; --i) { | |
node = nodes[i]; | |
dy = node.y + node.dy + nodePadding - y0; | |
if (dy > 0) node.y -= dy; | |
y0 = node.y; | |
} | |
} | |
}); | |
} | |
function ascendingDepth(a, b) { | |
return a.y - b.y; | |
} | |
} | |
function computeLinkDepths() { | |
nodes.forEach(function(node) { | |
node.sourceLinks.sort(ascendingTargetDepth); | |
node.targetLinks.sort(ascendingSourceDepth); | |
}); | |
nodes.forEach(function(node) { | |
var sy = 0, ty = 0; | |
node.sourceLinks.forEach(function(link) { | |
link.sy = sy; | |
sy += link.dy; | |
}); | |
node.targetLinks.forEach(function(link) { | |
link.ty = ty; | |
ty += link.dy; | |
}); | |
}); | |
function ascendingSourceDepth(a, b) { | |
return a.source.y - b.source.y; | |
} | |
function ascendingTargetDepth(a, b) { | |
return a.target.y - b.target.y; | |
} | |
} | |
function center(node) { | |
return node.y + node.dy / 2; | |
} | |
function value(link) { | |
return link.value; | |
} | |
return sankey; | |
}; |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
<!DOCTYPE html> | |
<html lang="en"> | |
<head> | |
<meta charset="UTF-8"> | |
<meta name="viewport" content="width=device-width, initial-scale=1.0"> | |
<meta http-equiv="X-UA-Compatible" content="ie=edge"> | |
<title>Document</title> | |
<style> | |
body { | |
margin-top: 30px; | |
} | |
svg { | |
display: block; | |
margin: 0 auto; | |
background-color: whitesmoke; | |
} | |
.node rect { | |
fill-opacity: .7; | |
shape-rendering: crispEdges; | |
} | |
.node text { | |
pointer-events: none; | |
font-family: Helvetica; | |
font-size: 12px; | |
fill: rgb(110, 107, 107); | |
} | |
</style> | |
</head> | |
<body> | |
<script src="https://cdnjs.cloudflare.com/ajax/libs/d3/4.13.0/d3.min.js"></script> | |
<script src="d3.sankey.js"></script> | |
<script src="https://cdnjs.cloudflare.com/ajax/libs/babel-standalone/6.26.0/babel.min.js"></script> | |
<script src="makeNetwork.js" lang='babel' type='text/babel'></script> | |
<script src="makeSankey.js" lang='babel' type='text/babel'></script> | |
</body> | |
</html> |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
const makeNetwork = function(csv) { | |
// log(csv); | |
// use only required attributes | |
const data = csv.map(element => { | |
return { | |
"Disruptions": "Disruptions", | |
"Status": element["Status"], | |
"Impact": element["Impact"], | |
"Activity Type" : element["Activity Type"], | |
"Traffic District": element["Traffic District"], | |
"Infrastructure": element["Infrastructure"] | |
}; | |
}); | |
// all the unique data values | |
const reduceFunc = (acc, curVal) => acc.concat(curVal); | |
const filterFunc = d => d.key != ""; | |
const allValues = data.map(d => Object.values(d)).reduce(reduceFunc, []) | |
.filter(d => d != ""); | |
// sankey nodes | |
const nodes = [...new Set(allValues)]; | |
const sankeyNodes = nodes.map(d => { return {name: d}; }); | |
// sankey flow order | |
// Disruptions → Status → Impact → Activity Type → Traffic District → Infrastructure | |
const order = [ | |
"Disruptions", "Status", "Impact", | |
"Activity Type", "Traffic District", "Infrastructure" | |
]; | |
//sankey links | |
const orderLinks = d3.range(1, order.length) | |
.map((d, i) => linkMaker(order[i], order[i + 1])) | |
.reduce(reduceFunc, []); | |
//sankey json | |
const network = {nodes: sankeyNodes, links: orderLinks}; | |
return network; | |
// builds the links | |
function linkMaker(attr1, attr2) { | |
const links = d3.nest().key(d => d[attr1]) | |
.key(d => d[attr2]) | |
.entries(data) | |
.filter(filterFunc) | |
.map(d => { | |
const flows = d.values.filter(filterFunc).map(p => { | |
return { | |
source : nodes.indexOf(d.key), | |
target : nodes.indexOf(p.key), | |
value : p.values.length | |
}; | |
}); | |
return flows; | |
}); | |
return links.reduce(reduceFunc, []); | |
}; | |
}; |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
const log = console.log; | |
const margin = {top: 30, right: 30, bottom: 30, left: 30}; | |
const width = 964 - margin.left - margin.right; | |
const height = 600 - margin.top - margin.bottom; | |
const formatNumber = d3.format(",.0f"); | |
const format = d => `${formatNumber(d)}`; | |
// define svg | |
const svg = d3.select("body").append("svg") | |
.attr("width", width + margin.left + margin.right) | |
.attr("height", height + margin.top + margin.bottom) | |
.append('g') | |
.attr("transform", `translate(${margin.left},${margin.top})`); | |
const defs = svg.append("defs"); | |
// load file | |
d3.csv("Traffic_Disruptions(July-23-2018).csv", makeSankey); | |
function makeSankey(csv) { | |
// sankey data and colors (fills) | |
const sankeyJson = makeNetwork(csv); | |
const color = d3.scaleOrdinal().domain(sankeyJson.nodes.map(d => d.name)) | |
.range([ | |
"#ad002d","#3addc5","#e600d2","#007203","#6b008e", | |
"#ffa834","#005da3","#e76800","#ceaeff","#003503", | |
"#ffa3d8","#00885c","#ac2600","#331a49","#8e6b00", | |
"#ffa7ad","#5d3a00","#d5c593","#6d0014","#ffa178"]); | |
// sankey layout - note alters initial sankey data | |
const sankey = d3.sankey() | |
.nodeWidth(15) | |
.nodePadding(30) | |
.size([width, height]) | |
.nodes(sankeyJson.nodes) | |
.links(sankeyJson.links) | |
.layout(100); | |
const path = sankey.link(); | |
const defaultOpacity = 0.3; | |
// add links | |
const links = svg.append('g').selectAll(".link") | |
.data(sankeyJson.links).enter() | |
.append("path") | |
.attr("class", "link") | |
.attr('d', path) | |
.style("stroke-width", d => Math.max(1, d.dy)) | |
.style("fill", "none") | |
.style("stroke-opacity", defaultOpacity) | |
.sort((a, b) => b.dy - a.dy) | |
.on("mouseover", function(){ | |
d3.select(this).style("stroke-opacity", 0.5); | |
}) | |
.on("mouseout", function(){ | |
d3.select(this).style("stroke-opacity", defaultOpacity); | |
}); | |
links.append("title") | |
.text(d => `${d.source.name} → ${d.target.name}\n${format(d.value)} Disruptions`); | |
// add nodes | |
const node = svg.append('g').selectAll(".node") | |
.data(sankeyJson.nodes) | |
.enter().append('g') | |
.attr("class", "node") | |
.attr("transform", d => `translate(${d.x},${d.y})`); | |
node.append("rect") | |
.attr("height", d => d.dy) | |
.attr("width", sankey.nodeWidth()) | |
.style("fill", d => { | |
if(color.domain().indexOf(d.name) > -1){ | |
return d.color = color(d.name); | |
} else { | |
return d.color = "whitesmoke"; | |
} | |
}) | |
.append("title") | |
.text(d => `${d.name}\n${format(d.value)}`); | |
node.append("text") | |
.attr('x', -6) | |
.attr('y', d => d.dy / 2) | |
.attr("dy", ".35em") | |
.attr("text-anchor", "end") | |
.attr("transform", null) | |
.text(d => d.name) | |
.filter(d => d.x < width / 2) | |
.attr('x', 6 + sankey.nodeWidth()) | |
.attr("text-anchor", "start"); | |
links.style("stroke", (d, i) => { | |
const gradientID = `gradient${i}`; | |
const startColor = d.source.color; | |
const stopColor = d.target.color; | |
const linearGradient = defs.append("linearGradient") | |
.attr("id", gradientID); | |
linearGradient.selectAll("stop") | |
.data([ | |
{offset: "10%", color: startColor}, | |
{offset: "90%", color: stopColor} | |
]) | |
.enter().append("stop") | |
.attr("offset", d => d.offset) | |
.attr("stop-color", d => d.color); | |
return `url(#${gradientID})`; | |
}); | |
}; |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Disruption Number | Date Issued | Starting Date | Finish Date | Status | Closure | ON | FROM | TO | Impact | Duration | Details | Description | Activity Type | Traffic District | Infrastructure | Location | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
281 | May 02 2018 | May 19 2018 | October 13 2018 | Current | 104 Street Total Closure | 104 Street NW | Jasper Avenue NW | 103 Avenue NW | Total Closure | Saturdays 6am - 4pm | 104 Street from Jasper Avenue to approximately 50m North of 102 Avenue will be closed Saturdays 6am - 4pm. See attached map. Detour using 105 Street or 103 Street. | Downtown Farmers Market | Special Event | Central | Road | (53.544606278034074, -113.4992377661625) | |
401 | June 01 2018 | June 10 2018 | September 30 2018 | Current | 111 Avenue Lane Reductions | 111 Avenue NW | 124 Street NW | 132 Street NW | Travel Delays | 4 Months | 111 Av from 124 St to 132 St will be reduced to 2 lanes each direction starting on Sunday, June 10th. There will be various sidewalk closures with ped accomodation or detours in place. Motorists can Detour using 118 Av or 107 Av. | 111 Avenue Road Rehab | Construction | Central | Road and Sidewalk | (53.55889444134047, -113.53589542996733) | |
38 | January 03 2018 | January 08 2018 | January 01 2020 | Current | 102 Ave Closure | 102 Avenue NW | 96 Street NW | 103 Street NW | Total Closure | 2 years | Starts Mon Jan 8, 102 Ave from 96 St - 103 St will be closed. Cross traffic at 97 St, 100 St, 101 St & 103 St will be maintained. Detour using Jasper Ave or 103A Ave | Valley Line LRT Construction | Construction | Central | Road and Sidewalk | (53.54466771586157, -113.48252888413757) | |
235 | April 17 2018 | April 23 2018 | Current | Cloverdale Rd Southbound Permanent Closure | Cloverdale Road | Connors Road NW | 97 Avenue NW | Permanent Closure | Permanent Closure Southbound | SELRT - Starting April 23, the Uphill direction of Cloverdale Hill will be closed permanently. Access from the Cloverdale Community to Connors Road will no longer be possible. Access to the Cloverdale Community FROM Connors Road will remain open. | LRT Road Reconfiguration | Construction | Southeast | Road | (53.53231468561249, -113.47297597154326) | ||
406 | June 04 2018 | June 08 2018 | September 30 2018 | Current | WB Whitemud Dr Road Rehabilitation | Whitemud Drive | Gateway Boulevard | Terwillegar Drive | Travel Delays | 4 Months | Starting June 8 at 10pm, Westbound Whitemud Dr will have reduced lane widths and a 60km/hr speed zone in place. On ramps will have reduced capacity and will enter Whitemud Dr under yield conditions. Please reduce speed when travelling through the site. | Road Rehabilitation | Construction | Southwest | Road | (53.48513037490145, -113.57166766049814) | |
426 | June 06 2018 | June 18 2018 | July 21 2018 | Current | 153 Street Watermain Replacement | 153 Street NW | 90 Avenue NW | 91 Avenue NW | Total Closure | 1 month | Traffic on 153 Street, 90 Avenue to 91 Avenue will be totally closed. Detour using meadowlark road & 149 Street. | Watermain Replacement | Construction | Northwest | Road and Sidewalk | (53.523100255212654, -113.58506464926405) | |
8 | November 02 2016 | November 01 2016 | December 31 2018 | Current | 102 St Building Construction Hoarding | 102 Street NW | 103 Avenue NW | 104 Avenue NW | Increased Travel Time | Long Term Project | 102 St from 103 Av to 104 Av will be reduced to one lane in each direction starting Tues, Nov 1 @ 10am for ICE District Stantec Tower and Marriot Hotel construction. Sidewalk on the West side of 102 St, 103 Av - 104 Av is also closed. | ICE District Building Const. | Construction | Central | Road and Sidewalk | (53.54459341402196, -113.49555525086656) | |
303 | May 08 2018 | May 08 2018 | May 08 2019 | Current | SELRT Connors Road Sidewalk Closure | Connors Road NW | 98 Avenue NW | 95 Street NW | Travel Delays | Long Term Closure | The sidewalk on Connors Road will be closed in order to accommodate road and rail work for Valley Line LRT. Follow marked detour route from Trail towards Muttart, to 97 Av east to Cloverdale Hill, and north to Connors Road. | SELRT Road and Rail work | Construction | Central | Sidewalk | (53.5372586254052, -113.48164745091908) | |
38 | January 03 2018 | January 08 2018 | January 01 2020 | Current | 102 Ave Closure | 102 Avenue NW | 96 Street NW | 103 Street NW | Total Closure | 2 years | Starts Mon Jan 8, 102 Ave from 96 St - 103 St will be closed. Cross traffic at 97 St, 100 St, 101 St & 103 St will be maintained. Detour using Jasper Ave or 103A Ave | Valley Line LRT Construction | Construction | Central | Road and Sidewalk | (53.54301311081867, -113.49740789670487) | |
25 | July 18 2016 | July 25 2016 | October 31 2018 | REVISED | 107 Street Total Closure | 107 Street NW | 105 Avenue NW | 106 Avenue NW | Total Closure | Long Term Projec | 107 St, 105 Av - Alley North of 105 Av will be totally closed to traffic starting Mon, July 24 @ 9am for to accommodate drainage tunnel shaft installation. Detour using 106 St or 108 St. Local and emergency access will be maintained. | Tunnel Shaft Installation | Construction | Central | Road | (53.547768910470666, -113.50475366907331) | |
207 | March 27 2018 | April 23 2018 | October 01 2018 | Current | Victoria Trial Reduced to 1 Lane Each Direction | Victoria Trail NW | 130 Avenue NW | Hooke Road | Travel Delays | 5.5 Months | Starting at 9 am on Monday, April 23, until ~ Monday, October 1, Victoria Trail will be reduced to 1 lane in each direction over the Kennedale Ravine. Use 50 Street for detours. | Bridge Rehabilitation | Construction | Northeast | Road | (53.58933673992949, -113.38568183109695) | |
394 | June 01 2018 | June 11 2018 | August 24 2018 | Current | 178 Street Road Rehabilitation Work | 178 Street NW | 81 Avenue NW | 87 Avenue NW | Increased Travel Time | 3 months | Traffic on 178 Street from 81 Avenue to 87 Avenue will be reduced to one lane in each directions. Detour using 170 Street and Anthony Henday Drive. | Road Rehabilitation | Construction | Northwest | Road and Sidewalk | (53.52128898003489, -113.63046868855544) | |
396 | June 01 2018 | June 04 2018 | July 01 2018 | Current | Ozerna Road Closed | Ozerna Road NW | 163 Avenue NW | 165 Avenue NW | Total Closure | 4 weeks | Ozerna Road will be closed from 163 Av to 165 Av starting on Monday, June 4 for approximately 4 weeks. Use 167 Av, 66 St and 82 St for detours. | Road Rehabilitation | Construction | Northeast | Road | (53.624904358435074, -113.44807162461777) | |
202 | March 23 2018 | April 04 2018 | September 30 2018 | Current | 105 Street SB Closure | 105 Street NW | Jasper Avenue NW | 100 Avenue NW | Directional Closure | 6 Months | 105 St SB from Jasper Av to the lane South of Jasper Av will be totally closed starting at 9am on Wed, April 4th for a drainage tunnel shaft. Parking bans will also in in place from Jasper Av to aprox 100m south of Jasper Av on both sides of 105 St. | Drainage Shaft | Construction | Central | Road | (53.540940868644185, -113.50106756928759) | |
32 | December 24 2015 | January 16 2015 | December 31 2018 | Current | 107 St Deep Sewer Const | 107 Street NW | 111 Avenue NW | 110 Avenue NW | Total Closure | 24 months | 107 St, 111 Av - Alley South of 111 Av will be totally closed starting Friday, January 16 @ 9am for approximately 2 years to facilitate drainage deep sewer tunnel shaft installation. Detour using 108 Street. | Drainage Tunnel Shaft Install | Construction | Central | Road and Sidewalk | (53.55884326278445, -113.50475708908863) | |
235 | April 17 2018 | April 23 2018 | Current | Cloverdale Rd Southbound Permanent Closure | Cloverdale Road | Connors Road NW | 97 Avenue NW | Permanent Closure | Permanent Closure Southbound | SELRT - Starting April 23, the Uphill direction of Cloverdale Hill will be closed permanently. Access from the Cloverdale Community to Connors Road will no longer be possible. Access to the Cloverdale Community FROM Connors Road will remain open. | LRT Road Reconfiguration | Construction | Southeast | Road | (53.53615710834535, -113.46853907254965) | ||
17 | June 09 2016 | June 10 2016 | October 31 2018 | REVISED | Hoarding | 79 Avenue NW | 101 Street NW | Increased Travel Time | Long Term | REVISED END DATE. The sidewalk on the north side of 79 Avenue and the east side of 101 Street will be closed for approximately a half block on 79 Ave and on 101 St and a temporary pedestrian corridor created due to condo construction | Building Construction Hoarding | Construction | Southeast | Road and Sidewalk | (53.5151716082807, -113.49132561833035) | ||
280 | May 02 2018 | May 19 2018 | October 13 2018 | Current | 102 Avenue Total Closure | 102 Avenue NW | 103 Street NW | 105 Street NW | Total Closure | Saturdays 6am - 4pm | 102 Avenue from 103 Street to 105 Street closed Saturdays 6am - 4pm. See attached map. Detour using Jasper Avenue or 103 Avenue. | Downtown Farmers Market | Special Event | Central | Road | (53.54301311081867, -113.49740789670487) | |
208 | March 27 2018 | April 18 2018 | October 01 2018 | Current | Reduced to 1 Lane Each Direction | Victoria Trail NW | 118 Avenue NW | Hermitage Road | Travel Delays | 5.5 Months | Starting at 9 am on Wednesday morning, April 18 until ~ Monday, October 1. Victoria Trail will be reduced to 1 lane in each direction over Yellowhead Trail. Detour using 50 Street or Anthony Henday Drive. | Bridge Rehabilitation | Construction | Northeast | Road | (53.57944631176562, -113.38237996133905) | |
34 | October 04 2017 | October 02 2017 | April 30 2019 | Current | 99 St Closure | 99 Street NW | 102 Avenue NW | 102A Avenue NW | Total Closure | 18 Months | 99 St, 102 Ave - 102A Ave & west sidewalk closed due to Valley Line LRT project for 18months. Detour using 97 St or 100 St | Valley Line LRT Project | Construction | Central | Road and Sidewalk | (53.543471437606314, -113.4889697964992) | |
394 | June 01 2018 | June 11 2018 | August 24 2018 | Current | 178 Street Road Rehabilitation Work | 178 Street NW | 81 Avenue NW | 87 Avenue NW | Increased Travel Time | 3 months | Traffic on 178 Street from 81 Avenue to 87 Avenue will be reduced to one lane in each directions. Detour using 170 Street and Anthony Henday Drive. | Road Rehabilitation | Construction | Northwest | Road and Sidewalk | (53.51489385781888, -113.63008075952452) | |
23 | November 14 2017 | November 14 2017 | December 02 2018 | Current | Hoarding | Stony Plain Road NW | 156 Street NW | 157 Street NW | Increased Travel Time | 12 1/2 Months | South side sidewalk will be covered with scaffolding on Stony Plain Road, from 156 Street to 157 Street. | Covered Sidewalk | Construction | Northwest | Sidewalk | (53.541293190600385, -113.59032624344836) | |
401 | June 01 2018 | June 10 2018 | September 30 2018 | Current | 111 Avenue Lane Reductions | 111 Avenue NW | 124 Street NW | 132 Street NW | Travel Delays | 4 Months | 111 Av from 124 St to 132 St will be reduced to 2 lanes each direction starting on Sunday, June 10th. There will be various sidewalk closures with ped accomodation or detours in place. Motorists can Detour using 118 Av or 107 Av. | 111 Avenue Road Rehab | Construction | Central | Road and Sidewalk | (53.55891772716225, -113.54958853643171) | |
412 | June 05 2018 | September 05 2018 | October 05 2018 | Current | 17 Street NE Closed | 17 Street NE | 121 Avenue NE | 127 Avenue NE | Total Closure | 1 Month | 17 Street NE will be closed from 121 Av NE to approx 170m N of 121 Av starting on Wednesday, September 5 for 1 month. Use 121 Av, RR 232, 137 Av, and Aurum Rd for detours. Follow detour route markers. | Pipeline Repair | Construction | Northeast | Road | (53.584843153992324, -113.31997891931763) | |
208 | March 27 2018 | April 18 2018 | October 01 2018 | Current | Reduced to 1 Lane Each Direction | Victoria Trail NW | 118 Avenue NW | Hermitage Road | Travel Delays | 5.5 Months | Starting at 9 am on Wednesday morning, April 18 until ~ Monday, October 1. Victoria Trail will be reduced to 1 lane in each direction over Yellowhead Trail. Detour using 50 Street or Anthony Henday Drive. | Bridge Rehabilitation | Construction | Northeast | Road | (53.570708652054115, -113.3871483842597) | |
33 | December 24 2015 | May 19 2015 | December 31 2018 | Current | 105 Street Northbound Directional Closure | 105 Street NW | 104 Avenue NW | 105 Avenue NW | Directional Closure | 2.5 Years | 105 Street NBD from 104 Avenue to 105 Avenue will be closed to traffic starting Tueday, May 19 @ 9am for approxiamtely 2.5 years to accommodate downtown storm tunnel intensification project. Detour using 109 Street or 101 Street. | Drainage Tunneling Project | Construction | Central | Road | (53.54621788544202, -113.50107257199707) | |
373 | May 29 2018 | June 03 2018 | August 26 2018 | Current | 102 Avenue Total Closure | 102 Avenue NW | 123 Street NW | 124 Street NW | Total Closure | Sundays 9am - 4pm | Sundays Only, June 3rd - August 26th, 2018, 102 Av will be totally closed from 123 St to 124 St including the bike lane from 9am to 4pm. Detour using other routes | 124 St Farmers Market | Special Event | Central | Road | (53.543016574606035, -113.53412815133146) | |
421 | June 06 2018 | June 11 2018 | October 31 2018 | Current | JMT Road Widening | James Mowatt Trail | Rutherford Road | 30 Avenue SW | Travel Delays | 5 Months | Phase 1 - At 9am on June 11, James Mowatt Tr will be restricted to one lane in each direction from north of 26 Ave SW to Rutherford Rd. Left turns will be banned SB from Bowen Wynd - 22 Ave SW and NB from 22 Ave SW - 17 Ave SW. Please use other routes. | Road Widening | Construction | Southwest | Road and Sidewalk | (53.42102928196522, -113.51662194721017) | |
6 | December 24 2015 | August 15 2015 | December 31 2018 | Current | Hoarding | 142 Street NW | Stony Plain Road | Travel Delays | 3 1/2 Years | Starting on Saturday August 15, 2015, the In House site (Previously know as Glenora Skyline) will erect hoarding to secure the project boundary. This will include a tempoary walk on the east side of 142 Street, north of Stony Plain Road. | New Building | Construction | Northwest | Sidewalk | (53.54293003877537, -113.56571657487626) | ||
262 | April 26 2018 | May 07 2018 | October 31 2018 | Current | 231 Street Road Rehabilitation | 231 Street NW | Secord Road NW | Stony Plain Road NW | Total Closure | 6 Months | 231 Street will be closed totally from Secord Road to Stony Plain Road (Hwy 16A). EMSA soccer facility access permitted from South end only. Detour using Winterburn Road (215 St). | Road Rehabilitation | Construction | Northwest | Road | (53.54134568821769, -113.7135694170039) | |
29 | March 14 2017 | March 20 2017 | August 31 2018 | Current | 105 Street Lane Closures | 105 Street NW | 99 Avenue NW | 100 Avenue NW | Major Delays | Long Term Project | 105 St NBD to 100 Av WBD Double Left Turn Closure. Left curb lane closed North of 99 Av. Motorists detour using 109 St or Bellamy Hill. West sidewalk closed from North of 99 Av to 100 Av. Pedestrians detour using East sidewalk. Reduce speed. Stay right. | Drainage Tunneling | Construction | Central | Road and Sidewalk | (53.53725097616026, -113.50108012512294) | |
200 | March 21 2018 | April 23 2018 | August 20 2018 | Current | 17 St NE Closed, 127 Av NE to 137 Av NE | 17 Street NE | 127 Avenue NE | 137 Avenue NE | Total Closure | 4 Months | Starting at 9am on Monday, April 23 until ~ August 20. 17 St NE will be closed from 127 Av NE to 137 Av NE.Use 121 Av NE, Range Road 232 and 137 Av NE for detours. Aurum Rd at 17 St NE will also be closed. | Roadway Upgrades | Construction | Northeast | Road | (53.584843153992324, -113.31997891931763) | |
406 | June 04 2018 | June 08 2018 | September 30 2018 | Current | WB Whitemud Dr Road Rehabilitation | Whitemud Drive | Gateway Boulevard | Terwillegar Drive | Travel Delays | 4 Months | Starting June 8 at 10pm, Westbound Whitemud Dr will have reduced lane widths and a 60km/hr speed zone in place. On ramps will have reduced capacity and will enter Whitemud Dr under yield conditions. Please reduce speed when travelling through the site. | Road Rehabilitation | Construction | Southwest | Road | (53.48043569908435, -113.49203440868324) | |
30 | December 13 2017 | September 14 2017 | August 31 2018 | Current | Total Closure | 151 Street | 99 Avenue | 20m east 99 Avenue | Increased Travel Time | 1 year | Total Closure of 151 Street from 99 Avenue to 20m east of 99 Avenue.Sidewalk remains open to pedestrian traffic on west side of 151 Street. | Drainage Construction | Construction | Northwest | Road and Sidewalk | (53.53771965324804, -113.58153170799089) | |
412 | June 05 2018 | September 05 2018 | October 05 2018 | Current | 17 Street NE Closed | 17 Street NE | 121 Avenue NE | 127 Avenue NE | Total Closure | 1 Month | 17 Street NE will be closed from 121 Av NE to approx 170m N of 121 Av starting on Wednesday, September 5 for 1 month. Use 121 Av, RR 232, 137 Av, and Aurum Rd for detours. Follow detour route markers. | Pipeline Repair | Construction | Northeast | Road | (53.574163363975536, -113.3199033589168) | |
207 | March 27 2018 | April 23 2018 | October 01 2018 | Current | Victoria Trial Reduced to 1 Lane Each Direction | Victoria Trail NW | 130 Avenue NW | Hooke Road | Travel Delays | 5.5 Months | Starting at 9 am on Monday, April 23, until ~ Monday, October 1, Victoria Trail will be reduced to 1 lane in each direction over the Kennedale Ravine. Use 50 Street for detours. | Bridge Rehabilitation | Construction | Northeast | Road | (53.58387558666639, -113.38366654609338) | |
205 | March 26 2018 | April 23 2018 | September 30 2020 | Current | Groat Road Bridge Rehabilitation | Groat Road NW | 87 Avenue NW | Victoria Park Road NW | Major Delays | 3 Years | Traffic on Groat Road from 87 Ave to Victoria Park Rd will be reduced to one lane in each direction due to bridge rehabilitations including Groat Brdg, Emily Murphy Park Rd Brdg and Groat Rd over Vic Park Rd Brdg . The pedestrian path will be maintained. | Bridge Rehabilitation | Construction | Central | Road and Sidewalk | (53.53935562103989, -113.53741611560739) | |
7 | November 02 2016 | November 01 2016 | December 31 2018 | Current | 103 Avenue Lane Reductions | 103 Avenue NW | 102 Street NW | 104 Street NW | Increased Travel Time | Long Term Project | 103 Av, 102 St - 104 St is reduced to one lane in each direction due to ICE District Building Construction. The North sidewalk is also closed. Pedestrians are asked to detour using the South sidewalk. | ICE District Building Const. | Construction | Central | Road and Sidewalk | (53.54459341402196, -113.49555525086656) | |
293 | May 04 2018 | May 09 2018 | August 31 2018 | Current | 113 Av Closed | 113 Avenue NW | 58 Street NW | 60 Street NW | Total Closure | 4 Months | 113 Av will be closed, starting on May 9 until August 31, from 58 St to 60 St for sewer upgrades.Use 112 Av or 118 Av for detours. | Sewer Upgrades | Construction | Northeast | Road | (53.56845116064235, -113.43070967060088) | |
262 | April 26 2018 | May 07 2018 | October 31 2018 | Current | 231 Street Road Rehabilitation | 231 Street NW | Secord Road NW | Stony Plain Road NW | Total Closure | 6 Months | 231 Street will be closed totally from Secord Road to Stony Plain Road (Hwy 16A). EMSA soccer facility access permitted from South end only. Detour using Winterburn Road (215 St). | Road Rehabilitation | Construction | Northwest | Road | (53.53228336145238, -113.71351707475081) | |
281 | May 02 2018 | May 19 2018 | October 13 2018 | Current | 104 Street Total Closure | 104 Street NW | Jasper Avenue NW | 103 Avenue NW | Total Closure | Saturdays 6am - 4pm | 104 Street from Jasper Avenue to approximately 50m North of 102 Avenue will be closed Saturdays 6am - 4pm. See attached map. Detour using 105 Street or 103 Street. | Downtown Farmers Market | Special Event | Central | Road | (53.54093119792682, -113.4992493670887) | |
421 | June 06 2018 | June 11 2018 | October 31 2018 | Current | JMT Road Widening | James Mowatt Trail | Rutherford Road | 30 Avenue SW | Travel Delays | 5 Months | Phase 1 - At 9am on June 11, James Mowatt Tr will be restricted to one lane in each direction from north of 26 Ave SW to Rutherford Rd. Left turns will be banned SB from Bowen Wynd - 22 Ave SW and NB from 22 Ave SW - 17 Ave SW. Please use other routes. | Road Widening | Construction | Southwest | Road and Sidewalk | (53.40469212384143, -113.53720543758674) | |
211 | April 03 2018 | April 30 2018 | Current | 101 Avenue Permanent Closure | 101 Avenue NW | Jasper Av NW | 96 Street NW | Permanent Closure | Permanent Closure | 101 Av, Jasper Av - 96 St will be permanently closed under a Bylaw closure beginning Monday, April 30. | Bylaw Closure | Central | Road | (53.542933838589484, -113.48173118571533) | |||
200 | March 21 2018 | April 23 2018 | August 20 2018 | Current | 17 St NE Closed, 127 Av NE to 137 Av NE | 17 Street NE | 127 Avenue NE | 137 Avenue NE | Total Closure | 4 Months | Starting at 9am on Monday, April 23 until ~ August 20. 17 St NE will be closed from 127 Av NE to 137 Av NE.Use 121 Av NE, Range Road 232 and 137 Av NE for detours. Aurum Rd at 17 St NE will also be closed. | Roadway Upgrades | Construction | Northeast | Road | (53.599514405883795, -113.31998028746948) | |
278 | May 01 2018 | May 10 2018 | October 04 2018 | Current | 108 Avenue Total closure | 108 Avenue NW | 123 Street NW | 124 Street NW | Total Closure | Thursdays (2pm - 8pm) | Thursdays only, May 10th - October 4th, 2018, 108 Av from 124 St - 123 St will be totally closed from 2pm - 8pm. Detour using other routes. No parking in closure area. | 124 Street Farmers Market | Special Event | Central | Road | (53.55255354728008, -113.53413289467804) | |
453 | June 13 2018 | June 25 2018 | August 30 2018 | Current | 153 Av Sidewalk Closed | 153 Avenue NW | Beaumaris Road NW | 102A Street NW | Total Closure | 10 Weeks | Starting on Monday, June 25 at 9am, the sidewalk on the NS of 153 Av at Beaumaris Rd to approx 100m E will be closed. The right turn bay on the NEC of 153 Av and Beaumaris Rd will also be closed. Follow the pedestrian detour signs to get around. | Sewer Installation | Construction | Northeast | Road and Sidewalk | (53.61409108036993, -113.50227368309177) | |
303 | May 08 2018 | May 08 2018 | May 08 2019 | Current | SELRT Connors Road Sidewalk Closure | Connors Road NW | 98 Avenue NW | 95 Street NW | Travel Delays | Long Term Closure | The sidewalk on Connors Road will be closed in order to accommodate road and rail work for Valley Line LRT. Follow marked detour route from Trail towards Muttart, to 97 Av east to Cloverdale Hill, and north to Connors Road. | SELRT Road and Rail work | Construction | Central | Sidewalk | (53.53231468561249, -113.47297597154326) | |
205 | March 26 2018 | April 23 2018 | September 30 2020 | Current | Groat Road Bridge Rehabilitation | Groat Road NW | 87 Avenue NW | Victoria Park Road NW | Major Delays | 3 Years | Traffic on Groat Road from 87 Ave to Victoria Park Rd will be reduced to one lane in each direction due to bridge rehabilitations including Groat Brdg, Emily Murphy Park Rd Brdg and Groat Rd over Vic Park Rd Brdg . The pedestrian path will be maintained. | Bridge Rehabilitation | Construction | Central | Road and Sidewalk | (53.52287423218436, -113.54077625911994) | |
31 | June 08 2016 | June 13 2016 | October 31 2018 | REVISED | 107 Street Total Closure | 107 Street NW | 108 Avenue NW | 109 Avenue NW | Total Closure | Long Term Project | REVISED END DATE. 107 St, 108 Av - 50m North of 108 Av will be totally closed to accommodate drainage tunnel shaft installation. Detour using 108 St or 106 St. Local and emergency access will be maintained. | Drainage Tunnel Install. | Construction | Central | Road | (53.55299933175915, -113.50475603178366) | |
10 | July 15 2016 | July 18 2016 | August 31 2018 | REVISED | 105 Street Lane Reductions | 105 Street NW | Jasper Avenue NW | 102 Avenue NW | Increased Travel Time | Long Term Project | REVISED END DATE. 105 St, Jasper Av to 100m North of Jasper Av will be reduced to one lane in each direction starting Monday, July 18 @ 9am.. Detour using 109 St or 107 St to avoid travel delays. | Mainline Re-route | Construction | Central | Road | (53.540940868644185, -113.50106756928759) | |
391 | May 31 2018 | May 31 2018 | August 31 2020 | Current | 3.2 Metre Width Reduction | Groat Road NW | 87 Avenue NW | 107 Avenue NW | Travel Delays | 3 Years | Groat Road Bridge and Victoria Park Road have a 3.2 Metre Width Reduction across the bridge decks. The Sidewalk is also very narrow. Please use Caution when driving through this job site, or take an alternate route around the area. | Construction - Groat Road Brge | Construction | Central | Road and Sidewalk | (53.52287423218436, -113.54077625911994) | |
391 | May 31 2018 | May 31 2018 | August 31 2020 | Current | 3.2 Metre Width Reduction | Groat Road NW | 87 Avenue NW | 107 Avenue NW | Travel Delays | 3 Years | Groat Road Bridge and Victoria Park Road have a 3.2 Metre Width Reduction across the bridge decks. The Sidewalk is also very narrow. Please use Caution when driving through this job site, or take an alternate route around the area. | Construction - Groat Road Brge | Construction | Central | Road and Sidewalk | (53.5509785190086, -113.54970056916223) | |
465 | June 15 2018 | June 15 2018 | June 30 2018 | Current | Fort Rd Reduced to 1 Lane SB | Fort Road NW | 122 Avenue NW | 77 Street NW | Travel Delays | 2 Weeks | Fort Rd will be reduced to 1 lane SB from 122 Av to 77 St from June 15 to June 30. Use Wayne Gretzky Dr for detours. | Sidewalk Repairs | Construction | Northeast | Road and Sidewalk | (53.576726792675665, -113.45923888867796) | |
467 | June 15 2018 | June 26 2018 | July 10 2018 | Current | 107 Avenue EB Lane Reduction | 107 Avenue NW | 127 Street NW | 126 Street NW | Travel Delays | 2 Weeks | 107 Av EB from 127 St to 126 St will be reduced to one lane each direction starting at 9am on Tues, June 26th for 2 weeks. Detour using other routes. | Waterline Installation | Construction | Central | Road and Sidewalk | (53.550963027118016, -113.54117175427542) | |
265 | April 27 2018 | June 20 2018 | October 31 2018 | REVISED | 170 St Road Realignment and Urbanization | 170 Street SW | Ellerslie Road | 41 Avenue SW | Total Closure | 4.5 Months | At 9am on June 20, 170 St SW will be closed to traffic from Ellerslie Rd - 41 Ave SW. Local access will be maintained to properties on 170 St SW from the south via 41 Ave SW. There will be a marked detour route using Ellerlie Rd, 141 St SW and 41 Ave SW. | Road Realignment/ Urbanization | Construction | Southwest | Road | (53.42253501917557, -113.61509947163172) | |
541 | July 09 2018 | July 09 2018 | July 30 2018 | Current | 62 St Total Closure | 62 Street NW | 101 Avenue NW | 101 A Avenue NW | Total Closure | 3 Weeks | 62 St closed from 101 Av to 101 A Av for utility repair | Utility Repairs | Construction | Southeast | Road | (53.54118981947138, -113.42818749596935) | |
265 | April 27 2018 | June 20 2018 | October 31 2018 | REVISED | 170 St Road Realignment and Urbanization | 170 Street SW | Ellerslie Road | 41 Avenue SW | Total Closure | 4.5 Months | At 9am on June 20, 170 St SW will be closed to traffic from Ellerslie Rd - 41 Ave SW. Local access will be maintained to properties on 170 St SW from the south via 41 Ave SW. There will be a marked detour route using Ellerlie Rd, 141 St SW and 41 Ave SW. | Road Realignment/ Urbanization | Construction | Southwest | Road | (53.395728704192976, -113.6146597327138) | |
171 | March 01 2018 | March 05 2018 | July 31 2018 | Current | 107 Street Total Closure | 107 Street NW | 110 Avenue NW | 109 Avenue NW | Total Closure | 3 Months | 107 St from the south side of 110 Av to aprox 50 m south of 110 Av will be closed starting Mon, March 5th at 9am. | Drainage Tunnel Shaft | Construction | Central | Road | (53.55672367944275, -113.50474986581288) | |
485 | June 20 2018 | June 23 2018 | July 28 2018 | Current | 99 Avenue Total Closure | 99 Avenue NW | 106 Street NW | 107 Street NW | Total Closure | Saturdays 7am to 7pm | Saturdays Only, 99 Av from 107 St to 106 St will be totally closed from 7am to 7pm June 23rd, June 30th, July 7th, July 21st, July 28th. | Concrete Pours / Crane Lifts | Construction | Central | Road | (53.537251524750005, -113.50291453459131) | |
491 | June 21 2018 | June 25 2018 | July 23 2018 | Current | 82 Av & 85 St Lane Closures | 82 Avenue NW | 85 Street NW | Major Delays | 4 Weeks | Starting Mon, Jun 25, 85 St, 82 - 83 Av will be reduced to a single lane in each direction, WB 82 Av will be reduced to single lane b/t 9-3pm moving to full time starting Jul 3, and the northwest corner 82 Av/85 St will be closed to pedestrians. | Gas Line Repairs | Construction | Southeast | Road and Sidewalk | (53.51803285179263, -113.45831882378722) | ||
493 | April 27 2018 | July 03 2018 | August 14 2018 | Current | 122 Av EB Closed | 122 Avenue NW | 92 Street NW | 82 Street NW | Directional Closure | 6 Weeks | Starting at 9am on Tuesday, July 3, 122 Av, 92 St to 82 St will be closed east bound until August 14. Use 123 Av and 120 Av for detours. | Road Rehabilitation | Construction | Northeast | Road | (53.57672605056298, -113.46731084143151) | |
268 | April 27 2018 | May 07 2018 | June 29 2018 | REVISED | 122 Av Closed from 80 St to Fort Rd | 122 Avenue NW | 80 Street NW | Fort Road NW | Total Closure | 7 Weeks | Starting at 7am on Monday, May 7, 122 Av, 80 St to Fort Rd will be closed until June 8. Use 123 Av and 120 Av for detours. (End date changed to June 29. 7 weeks total) | Road Rehabilitation | Construction | Northeast | Road | (53.57672625094388, -113.46365965524713) | |
493 | April 27 2018 | July 03 2018 | August 14 2018 | Current | 122 Av EB Closed | 122 Avenue NW | 92 Street NW | 82 Street NW | Directional Closure | 6 Weeks | Starting at 9am on Tuesday, July 3, 122 Av, 92 St to 82 St will be closed east bound until August 14. Use 123 Av and 120 Av for detours. | Road Rehabilitation | Construction | Northeast | Road | (53.5766239019235, -113.48268865471995) | |
458 | April 27 2018 | July 03 2018 | August 15 2018 | Current | 122 Av Closed from 80 St to 82 St | 122 Avenue NW | 80 Street NW | 82 Street NW | Total Closure | 7 Weeks | Starting at 9am on Tuesday, July 3, 122 Av, 80 St to 82 St will be closed until August 15. Use 123 Av and 120 Av for detours. (Start date revised from June 27 to July 3) | Road Rehabilitation | Construction | Northeast | Road | (53.57672625094388, -113.46365965524713) | |
497 | June 22 2018 | June 25 2018 | August 06 2018 | Current | Reduced to Single Lane Each Directions | 100 Street NW | Jasper Avenue NW | 103A Avenue NW | Increased Travel Time | 630pm-6am Nightly | Starts Monday June 25 for 6 weeks. 100 St will be reduced to single lane each direction due to LRT Utility work. Detour using other route. | Utility Work for VLRT | Construction | Central | Road and Sidewalk | (53.5461851090558, -113.49121592865565) | |
497 | June 22 2018 | June 25 2018 | August 06 2018 | Current | Reduced to Single Lane Each Directions | 100 Street NW | Jasper Avenue NW | 103A Avenue NW | Increased Travel Time | 630pm-6am Nightly | Starts Monday June 25 for 6 weeks. 100 St will be reduced to single lane each direction due to LRT Utility work. Detour using other route. | Utility Work for VLRT | Construction | Central | Road and Sidewalk | (53.541154456510235, -113.4902946741834) | |
503 | June 26 2018 | June 22 2018 | July 13 2018 | Current | 137 Av Reduced to 1 Lane EB | 137 Avenue NW | 66 Street NW | 61 Street NW | Travel Delays | 3 weeks | 137 Av will be reduced to 1 lane EB from 66 St to 61 St from June 22 to July 13 due to a major subsidence. Use 144 Av, 132 Av and Fort Rd for detours. | Subsidence Repair | Construction | Northeast | Road | (53.59944362967483, -113.43516848884468) | |
503 | June 26 2018 | June 22 2018 | July 13 2018 | Current | 137 Av Reduced to 1 Lane EB | 137 Avenue NW | 66 Street NW | 61 Street NW | Travel Delays | 3 weeks | 137 Av will be reduced to 1 lane EB from 66 St to 61 St from June 22 to July 13 due to a major subsidence. Use 144 Av, 132 Av and Fort Rd for detours. | Subsidence Repair | Construction | Northeast | Road | (53.59965624208792, -113.4429352160769) | |
504 | June 27 2018 | July 21 2018 | July 21 2018 | Current | 120 Street Total Closure | 120 Street NW | 109A Avenue NW | 111 Avenue NW | Total Closure | Saturday (7am - 1pm) | 120 St, 109A Av - 111 Av will be totally closed Saturday, June 21 from 7am to 1pm to accommodate Canadian Celiac Association Gluten Free Breakfast Block Party/Special Event. Detour using 119 Street. | Block Party | Special Event | Central | Road | (53.55888601130773, -113.52898945362513) | |
504 | June 27 2018 | July 21 2018 | July 21 2018 | Current | 120 Street Total Closure | 120 Street NW | 109A Avenue NW | 111 Avenue NW | Total Closure | Saturday (7am - 1pm) | 120 St, 109A Av - 111 Av will be totally closed Saturday, June 21 from 7am to 1pm to accommodate Canadian Celiac Association Gluten Free Breakfast Block Party/Special Event. Detour using 119 Street. | Block Party | Special Event | Central | Road | (53.55572608652981, -113.52886989466852) | |
506 | June 27 2018 | July 03 2018 | August 30 2018 | Current | 76 Ave Total Closure | 76 Avenue NW | 112 Street NW | 114 Street Nw | Total Closure | 2 Months | Starting July 3, 2018 at 9am, 76 Ave from 112 St to 114 St will be closed for a Road Rehabilitation. The Fire Hall and the Businesses will remain open during construction. ETS will be detoured to 72 Ave. Detour using 72 Ave or 82 Ave. | Road Rehabilitation | Construction | Central | Road | (53.512247021658155, -113.52581455768335) | |
506 | June 27 2018 | July 03 2018 | August 30 2018 | Current | 76 Ave Total Closure | 76 Avenue NW | 112 Street NW | 114 Street Nw | Total Closure | 2 Months | Starting July 3, 2018 at 9am, 76 Ave from 112 St to 114 St will be closed for a Road Rehabilitation. The Fire Hall and the Businesses will remain open during construction. ETS will be detoured to 72 Ave. Detour using 72 Ave or 82 Ave. | Road Rehabilitation | Construction | Central | Road | (53.5122606492498, -113.5199461321977) | |
508 | June 27 2018 | July 05 2018 | July 29 2018 | Current | Ellerslie Rd & Gateway Blvd Lane Closures | Ellerslie Road SW | Gateway Boulevard SW | Major Delays | 4 Weeks | Eastbound Ellerslie Rd SW will be reduced to one lane July 5 - 29th to accommodate pedestrians during construction. Gateway Blvd to Ellerslie Rd SW ramp will be reduced to a single lane off peak hours only July 5 - 12 and full time July 16 - 20 & July 26. | Right Turn Improvements | Construction | Southeast | Road and Sidewalk | (53.42481625397546, -113.49177106263134) | ||
509 | June 27 2018 | July 30 2018 | July 31 2018 | Current | Ellerslie Rd & Gateway Blvd Lane Closures | Ellerslie Road SW | Gateway Boulevard SW | Total Closure | 2 Days | Gateway Blvd off ramp onto Ellerslie Rd SW will be closed for construction Jul 30 and 31 from 9am-3pm. Use 41 Av SW or 23 Av NW. | Right Turn Improvements | Construction | Southeast | Road and Sidewalk | (53.42481625397546, -113.49177106263134) | ||
514 | June 28 2018 | July 03 2018 | July 17 2018 | Current | 50 St Reduced to 1 Lane NB | 50 Street NW | 131 Avenue NW | Travel Delays | 2 Weeks | Starting at 9am on Tuesday, July 3, 50 St will be reduced to 1 lane NB at 131 Av. 131 Av will also be closed EB and WB through the intersection. Use Victoria Tr, Fort Rd and 137 Av for detours. | Gas Line Installation | Construction | Northeast | Road | (53.592134894063534, -113.4162525460964) | ||
516 | June 28 2018 | June 27 2018 | December 01 2019 | Current | Hoarding | 103 Avenue NW | 101 Street NW | 102 Street NW | Increased Travel Time | 18 Months | 1)Curb lane closure on 103 Ave EB, 101 St - W of 101 St 2) South sidewalk closure on 103 Ave, 101 St - W of 101 St. Lane configuration has been modified to accommodate hoarding. | HSBC Bank Place Revitalization | Construction | Central | Road and Sidewalk | (53.544897059634884, -113.49372093739899) | |
1 | September 12 2016 | September 15 2016 | July 29 2018 | Current | Hoarding ES of Fort Rd | Fort Road NW | Belvedere Gate NW | Belvedere Way NW | Travel Delays | 10 Months | Covered sidewalk on ES of Fort Road from Belvedere Gate to Belvedere Way for tower crane in construction site. | Hoarding | Construction | Northeast | Sidewalk | (53.58662388549135, -113.43955599262056) | |
193 | March 15 2018 | April 19 2018 | July 22 2018 | REVISED | 170 Street Pedestrian Bridge Rehabilitation | 170 Street NW | 87 Avenue NW | 90 Avenue NW | Increased Travel Time | 4 Months | Traffic on 170 Street from 87 Avenue to 90 Avenue will be reduced to two lanes per direction. Night time, 170 Street will be reduced to one lane in each direction during 9 pm to 6 am intermittently. Detour using Anthony Henday Drive. | WEM Pedestrian Bridge Repair | Construction | Northwest | Road and Sidewalk | (53.52485931616542, -113.61535568343923) | |
193 | March 15 2018 | April 19 2018 | July 22 2018 | REVISED | 170 Street Pedestrian Bridge Rehabilitation | 170 Street NW | 87 Avenue NW | 90 Avenue NW | Increased Travel Time | 4 Months | Traffic on 170 Street from 87 Avenue to 90 Avenue will be reduced to two lanes per direction. Night time, 170 Street will be reduced to one lane in each direction during 9 pm to 6 am intermittently. Detour using Anthony Henday Drive. | WEM Pedestrian Bridge Repair | Construction | Northwest | Road and Sidewalk | (53.519554472617116, -113.61531596615988) | |
26 | November 28 2017 | November 30 2017 | July 29 2018 | Current | 118 Av Reduced to 1 Lane EB | 118 Avenue NW | 38 Street NW | 36 Street NW | Travel Delays | 8 Months | Starting at 9am on Thursday, November 30, 118 Av will be reduced to 1 lane EB from 38 St to 36 St. Use Yellowhead Tr for detours. | New Building Construction | Construction | Northeast | Road and Sidewalk | (53.570368276236835, -113.399948931577) | |
386 | May 31 2018 | June 04 2018 | July 08 2018 | Current | 118 Av Traffic Circle Reduced to 1 Lane | 118 Avenue NW | 101 Street NW | Princess Elizabeth Avenue NW | Travel Delays | 1.5 Months | Until June 22, the Traffic Circle on 118 Av from 101 St to Princess Elizabeth Av will be reduced to 1 lane for 2.5 weeks. Use 97 St and 106 St for detours. The S/W is still Closed until July 8. | Curb Ramp Installation | Construction | Northeast | Road | (53.57012357273243, -113.49397967051422) | |
518 | June 29 2018 | July 03 2018 | July 03 2018 | Current | 118 Av Reduced to 1 Lane WB | 118 Avenue NW | 68 Street NW | 69 Street NW | Travel Delays | 1 Day (7am to 7pm) | 118 Av will be reduced to 1 lane WB from 68 St to 69 St on Tuesday, July 3 from 7am to 7pm. Use 112 Av or Yelllowhead Tr for detours. | Concrete Repair | Construction | Northeast | Road | (53.570378887859476, -113.44633524924127) | |
472 | June 18 2018 | June 20 2018 | July 06 2018 | REVISED | 104 Street Sidewalk Repair | 104 Street NW | 61 Avenue NW | Travel Delays | 2 Weeks | At 9am on June 20, the right lane of 104 Street will be closed north and south of 61 Avenue to allow for an on street pedestrian detour due to repair work on the south west corner of the intersection. Please keep left to pass the lane closure. | Sidewalk Repair | Construction | Southwest | Road and Sidewalk | (53.49797331621397, -113.49768162666287) | ||
417 | June 06 2018 | June 11 2018 | November 30 2018 | REVISED | 122 St Road Rehabilitation | 122 Street NW | 51 Avenue NW | Fox Drive | Travel Delays | 6 Months | *Phase 2 * July 6 at 9am, 122 St will be reduced to one lane each way from north of 51 Ave - Fox Dr. No Left turns permitted for NB from north of 51 Ave - 62 Ave. Left turns will be maintained NB at 63 Ave but banned for SB. All turns maintained at Fox Dr | Road Rehabilitation | Construction | Southwest | Road | (53.50382118264795, -113.53891270432145) | |
417 | June 06 2018 | June 11 2018 | November 30 2018 | REVISED | 122 St Road Rehabilitation | 122 Street NW | 51 Avenue NW | Fox Drive | Travel Delays | 6 Months | *Phase 2 * July 6 at 9am, 122 St will be reduced to one lane each way from north of 51 Ave - Fox Dr. No Left turns permitted for NB from north of 51 Ave - 62 Ave. Left turns will be maintained NB at 63 Ave but banned for SB. All turns maintained at Fox Dr | Road Rehabilitation | Construction | Southwest | Road | (53.488302411917424, -113.54114061706119) | |
520 | July 04 2018 | July 08 2018 | September 21 2018 | Current | Fort Rd Reduced to 1 Lane Each Direction | Fort Road NW | 66 Street NW | 137 Avenue NW | Travel Delays | 11 Weeks | Fort Rd will be reduced to 1 lane in each direction from 66 St to 137 Av, from 8pm to 6pm, starting on Sunday, July 8 until Friday, September 21. Use 50 St and 66 St for detours. | Grind and Pave | Construction | Northeast | Road | (53.58506182737521, -113.44293369847288) | |
520 | July 04 2018 | July 08 2018 | September 21 2018 | Current | Fort Rd Reduced to 1 Lane Each Direction | Fort Road NW | 66 Street NW | 137 Avenue NW | Travel Delays | 11 Weeks | Fort Rd will be reduced to 1 lane in each direction from 66 St to 137 Av, from 8pm to 6pm, starting on Sunday, July 8 until Friday, September 21. Use 50 St and 66 St for detours. | Grind and Pave | Construction | Northeast | Road | (53.59875812791979, -113.42114647683643) | |
521 | July 04 2018 | July 16 2018 | July 25 2018 | Current | Nightly Alternating Directional Closures | 66 Street NW | 167 Avenue NW | 195 Avenue NW | Directional Closure | 10 Nights | 66 St will be closed nightly from 167 Av to 195 Av in alternating directions from 167 Av to 195 Av. Local access will be maintained. Avoid the area and use 97 St and Mannng Dr for detours. | Paving | Construction | Northeast | Road | (53.6578129633973, -113.43093575072349) | |
521 | July 04 2018 | July 16 2018 | July 25 2018 | Current | Nightly Alternating Directional Closures | 66 Street NW | 167 Avenue NW | 195 Avenue NW | Directional Closure | 10 Nights | 66 St will be closed nightly from 167 Av to 195 Av in alternating directions from 167 Av to 195 Av. Local access will be maintained. Avoid the area and use 97 St and Mannng Dr for detours. | Paving | Construction | Northeast | Road | (53.62864221202404, -113.4428421858877) | |
522 | July 04 2018 | July 21 2018 | July 29 2018 | Current | 167 Av Reduced to 1 Lane Each Direction | 167 Avenue NW | 50 Street NW | Manning Drive NW | Travel Delays | 9 Nights (8pm to 6am) | 167 Av, from 50 St to Manning Dr, will be reduced to 1 lane in each direction, from 8pm to 6am, starting on July 21 until July 29. Use Anthony Henday Dr or 153 Av for detours. | Grind and Pave | Construction | Northeast | Road | (53.62866382157558, -113.4118680936643) | |
522 | July 04 2018 | July 21 2018 | July 29 2018 | Current | 167 Av Reduced to 1 Lane Each Direction | 167 Avenue NW | 50 Street NW | Manning Drive NW | Travel Delays | 9 Nights (8pm to 6am) | 167 Av, from 50 St to Manning Dr, will be reduced to 1 lane in each direction, from 8pm to 6am, starting on July 21 until July 29. Use Anthony Henday Dr or 153 Av for detours. | Grind and Pave | Construction | Northeast | Road | (53.62568844348962, -113.3976045002256) | |
523 | July 04 2018 | August 07 2018 | August 11 2018 | Current | 137 Av Reduced to 1 Lane In Each Direction | 137 Avenue NW | Fort Road NW | 50 Street NW | Travel Delays | 5 Nights (930pm to 6am) | 137 Av, from 50 St to Fort Rd, will be reduced to 1 lane in each direction, from 9:30pm to 6am, from August 7 to 11. Use 50 St or Yellowhead Tr for detours. | Grind and Pave | Construction | Northeast | Road | (53.59875812791979, -113.42114647683643) | |
523 | July 04 2018 | August 07 2018 | August 11 2018 | Current | 137 Av Reduced to 1 Lane In Each Direction | 137 Avenue NW | Fort Road NW | 50 Street NW | Travel Delays | 5 Nights (930pm to 6am) | 137 Av, from 50 St to Fort Rd, will be reduced to 1 lane in each direction, from 9:30pm to 6am, from August 7 to 11. Use 50 St or Yellowhead Tr for detours. | Grind and Pave | Construction | Northeast | Road | (53.59707103817395, -113.41339242580796) | |
524 | July 04 2018 | July 18 2018 | July 31 2018 | Current | 153 Av Reduced to 1 Lane in Each Direction | 153 Avenue NW | Manning Drive NW | Fort Road NW | Travel Delays | 15 Nights (9:30pm to 6am) | 153 Av, from Manning Dr to Fort Rd, will be reduced to 1 lane in each direction, from 9:30pm to 6am, from July 18 to July 31. Use 144 Av or 134 Av for detours. | Grind and Pave | Construction | Northeast | Road | (53.61438825401146, -113.40351968164524) | |
524 | July 04 2018 | July 18 2018 | July 31 2018 | Current | 153 Av Reduced to 1 Lane in Each Direction | 153 Avenue NW | Manning Drive NW | Fort Road NW | Travel Delays | 15 Nights (9:30pm to 6am) | 153 Av, from Manning Dr to Fort Rd, will be reduced to 1 lane in each direction, from 9:30pm to 6am, from July 18 to July 31. Use 144 Av or 134 Av for detours. | Grind and Pave | Construction | Northeast | Road | (53.61547485602165, -113.3916856344501) | |
528 | July 04 2018 | July 10 2018 | August 08 2018 | Current | Manning Dr Reduced to 1 Lane Each Way | Manning Drive NW | 137 Avenue NW | 167 Avenue NW | Major Delays | 4 Weeks (Nights 7pm to 6am) | From July 10 to August 8, Manning Dr will be reduced to 1 lane in each direction from 137 Av to 167 Av, starting at 7pm until 6am nightly. | Grind and Pave | Construction | Northeast | Road | (53.62568844348962, -113.3976045002256) | |
528 | July 04 2018 | July 10 2018 | August 08 2018 | Current | Manning Dr Reduced to 1 Lane Each Way | Manning Drive NW | 137 Avenue NW | 167 Avenue NW | Major Delays | 4 Weeks (Nights 7pm to 6am) | From July 10 to August 8, Manning Dr will be reduced to 1 lane in each direction from 137 Av to 167 Av, starting at 7pm until 6am nightly. | Grind and Pave | Construction | Northeast | Road | (53.598834840417496, -113.42105726026122) | |
531 | July 04 2018 | July 04 2018 | December 01 2019 | Current | Hoarding | 101 Street NW | 102 Avenue NW | 103 Avenue NW | Increased Travel Time | 18 Months | 1)Curb lane closure on 101 St SB, 102 Ave - 103 Ave 2) West sidewalk closure on 101St, North of 102 Ave - South of 103 Ave. | HSBC Bank Place Revitalization | Construction | Central | Road and Sidewalk | (53.543142643273164, -113.4937227220872) | |
539 | July 06 2018 | July 09 2018 | July 30 2018 | Current | Reduced to Single Lane Eastbound | 103A Avenue NW | 95 Street NW | 96 Street NW | Increased Travel Time | 3 Weeks | Starts Mon July 9, 103A Ave EB will be reduced to single lane and south sidewalk closed due to sidewalk replacement. Detour using other route. | Sidewalk Replacement | Construction | Central | Road and Sidewalk | (53.54787734636046, -113.480247194876) | |
433 | June 08 2018 | June 13 2018 | July 31 2018 | Current | 104 Street Lane Closures | 104 Street NW | 76 Avenue NW | 73 Avenue NW | Major Delays | 6 Weeks | 104 St will be reduced to 2 lanes from 76 - 73 Avenue beginning Wed, Jun 13 Revised to 6 week duration. Use 109 St or 99 St as alternate routes. | 104 Street Water Line Work | Construction | Southeast | Road | (53.509265831351, -113.49768071047751) | |
433 | June 08 2018 | June 13 2018 | July 31 2018 | Current | 104 Street Lane Closures | 104 Street NW | 76 Avenue NW | 73 Avenue NW | Major Delays | 6 Weeks | 104 St will be reduced to 2 lanes from 76 - 73 Avenue beginning Wed, Jun 13 Revised to 6 week duration. Use 109 St or 99 St as alternate routes. | 104 Street Water Line Work | Construction | Southeast | Road | (53.51233894124811, -113.49765632440251) | |
543 | July 09 2018 | July 16 2018 | August 29 2018 | Current | Ellerslie Rd SW Total Closure | Ellerslie Road SW | Meridian Street SW | 17 Street SW | Total Closure | 6 Weeks | Starting, Mon, Jul 16 Ellerslie Rd SW will be closed from Meridian St to 17 St for complete road rehabilitation project. | Road Rehab | Construction | Southeast | Road | (53.424892530465996, -113.36830464817434) | |
543 | July 09 2018 | July 16 2018 | August 29 2018 | Current | Ellerslie Rd SW Total Closure | Ellerslie Road SW | Meridian Street SW | 17 Street SW | Total Closure | 6 Weeks | Starting, Mon, Jul 16 Ellerslie Rd SW will be closed from Meridian St to 17 St for complete road rehabilitation project. | Road Rehab | Construction | Southeast | Road | (53.42489045644292, -113.34450152104235) | |
545 | July 09 2018 | July 22 2018 | July 22 2018 | Current | Various Road Closures | 109 Street NW | 97 Avenue NW | Sask Drive NW | Total Closure | 7am - 10am | 2018 LuLu Lemon 10K Special Event. Total Closures 1) High Level Bridge 2) 88 Av, 109 St - 110 St 3) Sask Dr, 110 St - Emily Murphy Park Entrance 4) 90 Av, 110 St - 111 St 5) Various Windsor Park Neighborhood Closures. See attached MAP for detailed times. | LuLu Lemon 10K Special Event | Special Event | Central | Road | (53.534242089786744, -113.50825054508958) | |
549 | July 11 2018 | July 13 2018 | August 03 2018 | Current | 111 St Concrete Repair and RT Improvement | 111 Street NW | Whitemud Drive | Travel Delays | 3 Weeks | Starting at 9am on July 13, the following closures will occur at the intersections of 111 St and Whitemud Dr: The NB right lane and right turn bay , the EB right lane and the WB left lane east of 111 St NB. All turning movements will be maintained. | Whitemud Dr Rehab Project | Construction | Southwest | Road and Sidewalk | (53.48278419057808, -113.51678917420028) | ||
481 | June 20 2018 | July 16 2018 | September 04 2018 | REVISED | 106 St Road Rabilitation | 106 Street NW | 61 Avenue NW | 72 Avenue NW | Total Closure | 2 Months | Phase 2. Starting at 9am on July 16, the current 106 St closure from 67 Ave to 70 Ave will be extended north to 72 Ave and south to 61 Ave. ETS, Bicycle and local traffic will be detoured. Please use other routes. | Road Rehabilitation | Construction | Southwest | Road and Sidewalk | (53.508421431880244, -113.50441593955662) | |
481 | June 20 2018 | July 16 2018 | September 04 2018 | REVISED | 106 St Road Rabilitation | 106 Street NW | 61 Avenue NW | 72 Avenue NW | Total Closure | 2 Months | Phase 2. Starting at 9am on July 16, the current 106 St closure from 67 Ave to 70 Ave will be extended north to 72 Ave and south to 61 Ave. ETS, Bicycle and local traffic will be detoured. Please use other routes. | Road Rehabilitation | Construction | Southwest | Road and Sidewalk | (53.49816803953901, -113.50440879793287) | |
551 | July 11 2018 | July 13 2018 | September 30 2018 | Current | 106 Av Lane Closures | 106 Avenue NW | 67 Street NW | 76 Street NW | Major Delays | 2.5 months | Starting Fri, Jul 13 @ 9am 106 Av will be reduced to a single lane in each direction for through traffic. Eastbound 106 Av to northbound Wayne Gretzky Dr. Left Turn will be banned. Use other routes. | Road Rehab | Construction | Southeast | Road | (53.54934230518843, -113.44456633705362) | |
551 | July 11 2018 | July 13 2018 | September 30 2018 | Current | 106 Av Lane Closures | 106 Avenue NW | 67 Street NW | 76 Street NW | Major Delays | 2.5 months | Starting Fri, Jul 13 @ 9am 106 Av will be reduced to a single lane in each direction for through traffic. Eastbound 106 Av to northbound Wayne Gretzky Dr. Left Turn will be banned. Use other routes. | Road Rehab | Construction | Southeast | Road | (53.5493395792969, -113.43275831777343) | |
553 | July 11 2018 | July 11 2018 | July 17 2018 | Emergency | 101 Street Lane Reductions | 101 Street NW | 111 Avenue NW | 110 Avenue NW | Increased Travel Time | 1 Week | 101 St SBD, North of 111 Av - South of 111 Av is reduced to one lane. 111 Av WBD, East of 101 St - West of 101 St reduced to one lane. Emergency watermain break. North side crosswalk at 111 Av/101 St is also closed. Detour using South side crosswalk. | Emergency Watermain Break | Construction | Central | Road and Sidewalk | (53.55889219611187, -113.4937338324003) | |
556 | July 12 2018 | July 13 2018 | August 10 2018 | Current | 199 St Road Urbanization | 199 Street NW | Grandisle Road | Edgemont Boulevard | Travel Delays | 1 Month | On July 13 the following will occur in the 199 St and 23 Ave area: 199 St south of 23 Ave will be shifted to a detour road east of 199 St, 199 St north of 23 Ave will be opened to traffic and the previous 199 St detour road north of 23 Ave will be closed. | Road Urbanization | Construction | Southwest | Road | (53.43801817553263, -113.66432465837141) | |
556 | July 12 2018 | July 13 2018 | August 10 2018 | Current | 199 St Road Urbanization | 199 Street NW | Grandisle Road | Edgemont Boulevard | Travel Delays | 1 Month | On July 13 the following will occur in the 199 St and 23 Ave area: 199 St south of 23 Ave will be shifted to a detour road east of 199 St, 199 St north of 23 Ave will be opened to traffic and the previous 199 St detour road north of 23 Ave will be closed. | Road Urbanization | Construction | Southwest | Road | (53.46859182096422, -113.66447318042165) | |
558 | July 12 2018 | July 16 2018 | July 23 2018 | Current | Westbound Roper Rd Lane Closure | Roper Road NW | 50 Street NW | 54 Street NW | Travel Delays | 1 Week | Westbound Roper Road, 50 - 54 St will be reduced to a single lane full time for one week for water valve work. Use other routes. | Water Valve Repair | Construction | Southeast | Road | (53.495511180929476, -113.41819218077394) | |
560 | July 12 2018 | July 23 2018 | July 24 2018 | Current | Whitemud Drive Lane Closures | Whitemud Drive NW | 17 Street NW | Travel Delays | 1 Night 10pm to 6am | Whitemud Dr will be reduced to a single lane in each direction for one night Jul 23 10pm to 6am Jul 24. Use other routes. | Bridge Washing | Construction | Southeast | Road | (53.48206518213646, -113.3687822424978) | ||
561 | July 12 2018 | July 20 2018 | July 20 2018 | Current | Jasper Av/101 St Total Closures | Jasper Avenue NW | 100 Street NW | 109 Street NW | Total Closure | 8:30am - 1pm | 101 St, Jasper Av - 103 Av aslo totally closed. As per attached MAP. | Special Event (KDays Parade) | Special Event | Central | Road | (53.541154456510235, -113.4902946741834) | |
561 | July 12 2018 | July 20 2018 | July 20 2018 | Current | Jasper Av/101 St Total Closures | Jasper Avenue NW | 100 Street NW | 109 Street NW | Total Closure | 8:30am - 1pm | 101 St, Jasper Av - 103 Av aslo totally closed. As per attached MAP. | Special Event (KDays Parade) | Special Event | Central | Road | (53.54093917811752, -113.5084386770841) | |
565 | July 13 2018 | July 13 2018 | July 20 2018 | Emergency | 118 Avenue sink hole repair | 118 Avenue NW | 149 Street NW | 150 Street NW | Increased Travel Time | One Week | Traffic on Westbound direction of 118 Avenue from 149 Street to 150 Street will be reduced to single lane due to emergency sink hole repair. Detour using 111 Avenue. | Roadway repair | Construction | Northwest | Road | (53.57041872070606, -113.57801788835275) | |
566 | July 05 2018 | July 25 2018 | July 26 2018 | Current | Groat Road Southbound Closure | Groat Road NW | Victoria Park Road NW | River Valley Road NW | Directional Closure | Night closure (10pm - 5am) | Groat Rd SB will be closed overtop of Victoria P Rd Bridge. Victoria P Rd WB to Groat Rd SB and River V Rd EB will be closed. Groat Rd SB to River V Rd EB will remain open. River V Rd WBD to Groat Rd SB will remain open. | Bridge Construction | Construction | Northwest | Road | (53.53935562103989, -113.53741611560739) | |
567 | July 05 2018 | July 20 2018 | July 21 2018 | Current | Victoria Park Road WBD to Groat SBD construction | Victoria Park Road NW | Groat Road NW | Directional Closure | Night closure (10pm - 5am) | Victoria Park Road WBD to Groat Road SBD and River Valley Road EBD will be closed. Groat Road SBD to River Valley Road EBD will remain open. River Valley Road WBD to Groat Road SBD will remain open. | Bridge Construction | Construction | Northwest | Road | (53.53935562103989, -113.53741611560739) | ||
538 | July 06 2018 | July 17 2018 | July 19 2018 | REVISED | 30 Ave SW Grinding and Paving | 30 Avenue SW | Allard Link | 111 Street SW | Total Closure | 3 Days (9am - 3pm) | Starting at 9am on July 17, 18 and 19, 30 Ave SW will be closed to traffic from Allard Link to 111 St SW until 3pm for road paving. Please detour using Ellerslie Rd or 41 Ave SW. | Grinding and Paving | Construction | Southwest | Road | (53.404660848505856, -113.52160116485481) | |
538 | July 06 2018 | July 17 2018 | July 19 2018 | REVISED | 30 Ave SW Grinding and Paving | 30 Avenue SW | Allard Link | 111 Street SW | Total Closure | 3 Days (9am - 3pm) | Starting at 9am on July 17, 18 and 19, 30 Ave SW will be closed to traffic from Allard Link to 111 St SW until 3pm for road paving. Please detour using Ellerslie Rd or 41 Ave SW. | Grinding and Paving | Construction | Southwest | Road | (53.40734232818376, -113.51532179780374) | |
569 | July 15 2018 | July 16 2018 | July 17 2018 | REVISED | Dawson Bridge Closed | Rowland Road NW | 87 Street NW | 84 Street NW | Total Closure | 2 Days | Dawson Bridge will be closed from Monday, July 16 starting at 1030am until 6am on Wednesday, July 18 due to emergency water main break repairs. Use 98 Av or 112 Av for detours. (Start date and time revised, completion time added) | Water Main Break | Construction | Central | Road | (53.54936441494053, -113.45710449697432) | |
569 | July 15 2018 | July 16 2018 | July 17 2018 | REVISED | Dawson Bridge Closed | Rowland Road NW | 87 Street NW | 84 Street NW | Total Closure | 2 Days | Dawson Bridge will be closed from Monday, July 16 starting at 1030am until 6am on Wednesday, July 18 due to emergency water main break repairs. Use 98 Av or 112 Av for detours. (Start date and time revised, completion time added) | Water Main Break | Construction | Central | Road | (53.548280078550555, -113.46916132718668) | |
572 | July 16 2018 | July 23 2018 | October 30 2018 | Current | 111 Avenue Road Construction | 111 Avenue NW | 142 Street NW | 149 Street NW | Increased Travel Time | 3 Months | Traffic on 111 Avenue from 142 Street to 149 Street will be reduced to single lane due to road construction. Detour using 107 Avenue and Yellowhead Trail. | Road Construction | Construction | Northwest | Road and Sidewalk | (53.558897550328254, -113.57807459215901) | |
573 | July 16 2018 | July 23 2018 | August 17 2018 | Current | 118 Avenue Watermain Construction | 118 Avenue NW | 127 Street NW | 128 Street NW | Increased Travel Time | 4 Weeks | Traffic on 118 Avenue, 127 Street to 128 Street will be reduced to one lane Westbound and two lanes Eastbound. Detour using 107 Avenue and Yellowhead trail. | Watermain construction | Construction | Northwest | Road | (53.570323799722665, -113.54117052237476) | |
572 | July 16 2018 | July 23 2018 | October 30 2018 | Current | 111 Avenue Road Construction | 111 Avenue NW | 142 Street NW | 149 Street NW | Increased Travel Time | 3 Months | Traffic on 111 Avenue from 142 Street to 149 Street will be reduced to single lane due to road construction. Detour using 107 Avenue and Yellowhead Trail. | Road Construction | Construction | Northwest | Road and Sidewalk | (53.55889471081128, -113.56576346677667) | |
562 | July 12 2018 | July 17 2018 | July 21 2018 | REVISED | Manning Dr Closed NB | Manning Drive NW | 137 Avenue NW | 167 Avenue NW | Directional Closure | 5 Nights (10pm to 6am) | Manning Dr NB Closed: July 17, 137 Av to 50 St; July 18, 50 St to 144 Av; July 19, 144 Av to 153 Av; July 20 & 21, 153 Av to 167 Av. Use other routes. (Dates Revised. Starting July 17 rather than July 13) | Paving | Construction | Northeast | Road | (53.598834840417496, -113.42105726026122) | |
562 | July 12 2018 | July 17 2018 | July 21 2018 | REVISED | Manning Dr Closed NB | Manning Drive NW | 137 Avenue NW | 167 Avenue NW | Directional Closure | 5 Nights (10pm to 6am) | Manning Dr NB Closed: July 17, 137 Av to 50 St; July 18, 50 St to 144 Av; July 19, 144 Av to 153 Av; July 20 & 21, 153 Av to 167 Av. Use other routes. (Dates Revised. Starting July 17 rather than July 13) | Paving | Construction | Northeast | Road | (53.62568844348962, -113.3976045002256) | |
540 | January 03 2018 | July 10 2018 | July 27 2018 | REVISED | Reduced to Single Lane Each Direction | 104 Avenue NW | 102 Street NW | 104 Street NW | Increased Travel Time | 1 Week | Starts Tues. July 10 at 10am for 1 week, 104 Ave, 102 St - 104 St will be reduced to single lane each direction. Detour using other route. | Drainage Work | Construction | Central | Road | (53.54617454103664, -113.49555613988215) | |
519 | July 03 2018 | July 03 2018 | July 27 2018 | Current | 102 Street Total Closure | 102 Street NW | 103 Avenue NW | 104 Avenue NW | Total Closure | Tues - Fri (6pm - 6am) | 102 St, North of 103 Av to 104 Av will be totally closed from 6pm to 6am to accommodate pedway construction. Local and parkade access will be maintained. Detour using 101 St or 104 St. | Pedway Construction | Construction | Central | Road | (53.54459341402196, -113.49555525086656) | |
9 | February 22 2017 | March 01 2017 | December 31 2018 | REVISED | SELRT Bridge Construction | Whitemud Drive NW | 66 Street NW | Travel Delays | 22 Months | REVISED END DATE. Whitemud Drive at 66 Street will have the inside lane closed eastbound and westbound to construct the Valley Line LRT Bridge. Traffic is encouraged to stay right or detour using 34 Avenue | Bridge Construction | Construction | Southeast | Road | (53.48508931430974, -113.44266040279611) | ||
577 | July 17 2018 | July 21 2018 | July 23 2018 | Current | WB Whitemud Dr Rehab | Whitemud Drive | 99 Street NW | Terwillegar Drive | Travel Delays | 2 Days | Starting at 6am on July 21, Whitemud Dr Westbound will be reduced to 2 lanes from 99 St - Rainbow Valley Bridge until 8pm. At 8pm the lane closure will be partially removed and only remain from 122 St to Rainbow Valley Bridge until 6am July 23. | Whitemud Dr Rehab Project | Construction | Southwest | Road | (53.48039610508215, -113.48609705624474) | |
577 | July 17 2018 | July 21 2018 | July 23 2018 | Current | WB Whitemud Dr Rehab | Whitemud Drive | 99 Street NW | Terwillegar Drive | Travel Delays | 2 Days | Starting at 6am on July 21, Whitemud Dr Westbound will be reduced to 2 lanes from 99 St - Rainbow Valley Bridge until 8pm. At 8pm the lane closure will be partially removed and only remain from 122 St to Rainbow Valley Bridge until 6am July 23. | Whitemud Dr Rehab Project | Construction | Southwest | Road | (53.48513037490145, -113.57166766049814) | |
578 | July 17 2018 | July 23 2018 | August 03 2018 | Current | Whitemud Dr WB Grind and Pave | Whitemud Drive | 99 Street NW | Terwillegar Drive | Travel Delays | 2 Weeks (10pm - 6am) | ** Phase 1 ** Starting at 10pm on July 23, Westbound Whitemud Drive will be reduced to one lane nightly from east of 99 Street - west of Rainbow Valley Bridge until 6am the following day. Please keep right to pass the lane closures. | Whitemud Dr WB Grind and Pave | Construction | Southwest | Road | (53.48513037490145, -113.57166766049814) | |
578 | July 17 2018 | July 23 2018 | August 03 2018 | Current | Whitemud Dr WB Grind and Pave | Whitemud Drive | 99 Street NW | Terwillegar Drive | Travel Delays | 2 Weeks (10pm - 6am) | ** Phase 1 ** Starting at 10pm on July 23, Westbound Whitemud Drive will be reduced to one lane nightly from east of 99 Street - west of Rainbow Valley Bridge until 6am the following day. Please keep right to pass the lane closures. | Whitemud Dr WB Grind and Pave | Construction | Southwest | Road | (53.48039610508215, -113.48609705624474) | |
579 | July 17 2018 | July 20 2018 | August 24 2018 | Current | Whitemud Dr EB C-D Road Closure | Whitemud Drive | 106 Street NW | Total Closure | 5 Weeks | Starting at 9am on July 20, the EB Whitemud Drive C-D road that connects 106 St to Calgary Tr will be closed. There will be single lane closures NB and EB approaching the intersection. Please use 111 St to Whitemud Dr EB or Calgary Tr via 51 Ave to detour | Whitemud Dr Rehabilitation | Construction | Southwest | Road and Sidewalk | (53.48140269837642, -113.50426859720967) | ||
544 | July 09 2018 | July 25 2018 | August 15 2018 | Current | 64 Av Total Closure | 64 Avenue NW | 104 Street | 105 Street NW | Total Closure | 3 Weeks | Starting Wed, Jul 25 at 9am, 64 Av will be closed from 104 St to the alley west. Use other routes. | Utility Repairs | Construction | Road | (53.50074175138267, -113.49768368971239) | ||
542 | July 09 2018 | July 25 2018 | August 15 2018 | Current | 104 Street Lane Closures | 104 Street NW | 65 Avenue NW | 63 Avenue NW | Major Delays | 3 Weeks | Starting Weds, Jul 25 at 9am, 104 St will be reduced to two lanes from 65 - 63 Av. Expect Major Delays. Use other routes. | Utility Repairs | Construction | Road | (53.50159914143773, -113.49768274849035) | ||
581 | July 18 2018 | July 18 2018 | July 23 2018 | Current | 115 Ave Closure | 115 Avenue NW | 91 Street NW | 94 Street NW | Total Closure | 5 Days | 115 Ave, 91 St - 94 St closed due to waterline installation. Detour using other route. | Waterline Installation | Construction | Central | Road and Sidewalk | (53.56581669629031, -113.4811871749676) | |
582 | July 18 2018 | July 18 2018 | July 20 2018 | Current | 103 Avenue Total Closure | 103 Avenue NW | 102 Street NW | 103 Street NW | Total Closure | 630pm to 6am Nightly | 103 Ave, 102 St - 103 St closed on July 18 - 20 from 630pm to 6am nightly due to fibre optic installation. Detour using other route. | Fibre Optic Installation | Construction | Central | Road | (53.54459458056498, -113.49738914959538) | |
515 | June 28 2018 | July 03 2018 | July 27 2018 | Current | 102 St SB Closure | 102 Street NW | 103 Avenue NW | 104 Avenue NW | Directional Closure | Starts Tues. July 3 at 9am, 102 St SB from 104 Ave to alley south of 104 Ave will be closed due to drainage work. Parkade access via 103 Ave - 102 St. | Drainage Work | Construction | Central | Road | (53.54459341402196, -113.49555525086656) | ||
22 | December 15 2017 | December 19 2017 | July 20 2018 | REVISED | BMO Building Demo | 101 Street NW | 101A Avenue NW | 102 Avenue NW | Increased Travel Time | 1) Curb lane & east sidewalk closure 101 St NB, 102 Av to lane S of 102 Ave 2) South sidewalk closure on 102 Av, 100A St - 101 St 3) West sidewalk closure on 100A St, 102 Av to lane S of 102 Ave 4) Staged closure of alley S of 102 Av, 100A St - 101 St. | Hoarding | Construction | Central | Road and Sidewalk | (53.543142643273164, -113.4937227220872) | ||
583 | July 18 2018 | July 16 2018 | August 17 2018 | Current | Whitemud Speed Reduction | Whitemud Drive NW | 170 Street NW | Anthony Henday Drive NW | Increased Travel Time | One Month | Speed reduction to Max 60km/h will be in effect on Whitemud Drive from Anthony Henday Drive to 170 Street due to concrete median barrier replacement. | Concrete Jersey Barrier work | Construction | Northwest | Road | (53.51222473779908, -113.65849616827272) | |
583 | July 18 2018 | July 16 2018 | August 17 2018 | Current | Whitemud Speed Reduction | Whitemud Drive NW | 170 Street NW | Anthony Henday Drive NW | Increased Travel Time | One Month | Speed reduction to Max 60km/h will be in effect on Whitemud Drive from Anthony Henday Drive to 170 Street due to concrete median barrier replacement. | Concrete Jersey Barrier work | Construction | Northwest | Road | (53.51210175552203, -113.61533691019326) | |
584 | July 18 2018 | July 18 2018 | August 01 2018 | Current | 82 St SB R Turn Bay to YHT WB Closure | 82 Street NW | Yellowhead Trail NW | Directional Closure | 2 Weeks | Starting on July 18, the right turn bay from SB 82 St to WB YHT will be closed due to a large subsidence. Once the repairs have been completed the closure will be removed. | Emergency Subsidence Repair | Construction | Northeast | Road | (53.5821690342696, -113.46733154624384) | ||
27 | February 13 2017 | February 13 2017 | August 31 2018 | Current | Covered walk at 105 St and 82 Ave | 105 Street NW | 81 Avenue NW | 82 Avenue NW | Travel Delays | 1.5 years | Covered walk and parking lane closure East side 105 St Lane S of 82 Av to 82 Av. Covered walk on South Side 82 Av from 105 to to East of 105 St. Pedestrians can detour via West side of 105 St & north side 82 Ave. | Building Construction | Construction | Southeast | Road and Sidewalk | (53.517080484870135, -113.50046426730667) | |
510 | June 04 2018 | July 09 2018 | July 19 2018 | REVISED | 127 Street Paving | 127 Street NW | 158 Avenue NW | 167 Avenue NW | Travel Delays | 10 days (9am - 3pm) | Traffic on 127 Street will be split to East Side from 167 Avenue to 158 Avenue. Detour using 142 Street & Castledowns Road. | Paving | Construction | Northwest | Road | (53.6203064331923, -113.54120159583825) | |
510 | June 04 2018 | July 09 2018 | July 19 2018 | REVISED | 127 Street Paving | 127 Street NW | 158 Avenue NW | 167 Avenue NW | Travel Delays | 10 days (9am - 3pm) | Traffic on 127 Street will be split to East Side from 167 Avenue to 158 Avenue. Detour using 142 Street & Castledowns Road. | Paving | Construction | Northwest | Road | (53.628762102438436, -113.54123155203588) | |
585 | July 18 2018 | July 14 2018 | August 01 2018 | Current | 99 Avenue Total Closure | 99 Avenue NW | 109 Street | 107 Street | Total Closure | Approx 2 Weeks | 99 Av, 107 St - Alley East of 107 St Festival Closure for Taste Of Edmonton Special Event. Detour using 100 Av. | Taste Of Edmonton Event | Special Event | Central | Road | (53.537256418374724, -113.50843103552523) | |
586 | July 18 2018 | July 18 2018 | July 23 2018 | Current | Reduced to one lane | 90 Avenue NW | 75 Street NW | 76 Street NW | Travel Delays | 5 Days | Starting July 18, 90 Ave W/B will be reduced to one lane from 75 St to 76 St for Emergency Hydrant Repair. Use other routes. | Emergency Hydrant Repair | Construction | Southeast | Road | (53.525231602066405, -113.44290760997328) | |
588 | July 18 2018 | July 18 2018 | July 20 2018 | Current | One lane Closed N/B & S/B | 109 Street NW | 81 Avenue NW | 82 Avenue NW | Travel Delays | 2 Days | The inside lanes both N/B and S/B on 109 St from 81 Ave to 82 Ave will be closed as well as the 109 St N/B to W/B 82 Ave turn bay, due to a water main break. Use other routes. | Water Main Break | Construction | Central | Road | (53.517103593206926, -113.51204422529558) | |
587 | July 18 2018 | July 16 2018 | July 22 2018 | Current | 122 Av Closed | 122 Avenue NW | 127 Street NW | 125 Street NW | Total Closure | 7 Days | 122 Av, from 127 St to 125 St will be closed from Monday, July 16 until Friday, Sunday, July 22. Use 123 or 121 Av for detours. (Duration revised to 7 days) | Road Rehabilitation | Construction | Northeast | Road | (53.57668779553476, -113.54118933902883) | |
580 | July 17 2018 | July 19 2018 | July 22 2018 | REVISED | 66 Street Closed | 66 Street NW | Anthony Henday Drive | 170 Avenue NW | Directional Closure | 4 Nights | 66 Street will be closed NB for 2 nights from 7pm to 6am on July 19 & 20 and SB for two nights on July 21 & 22. Use 97 St, Manning Dr, or 153 Av for detours from the Anthony Henday. (dates revised, NB and SB for one night.) | Paving | Construction | Northeast | Road | (53.632286748264576, -113.44280379691408) | |
580 | July 17 2018 | July 19 2018 | July 22 2018 | REVISED | 66 Street Closed | 66 Street NW | Anthony Henday Drive | 170 Avenue NW | Directional Closure | 4 Nights | 66 Street will be closed NB for 2 nights from 7pm to 6am on July 19 & 20 and SB for two nights on July 21 & 22. Use 97 St, Manning Dr, or 153 Av for detours from the Anthony Henday. (dates revised, NB and SB for one night.) | Paving | Construction | Northeast | Road | (53.64701960703178, -113.43902885435031) | |
589 | July 19 2018 | July 13 2018 | July 27 2018 | Current | 99 Street Lane Closure | 99 Street NW | 47 Avenue NW | 45 Avenue NW | Major Delays | 2 Weeks | Southbound 99 Street is reduced to a single lane at 45 Av due to a heave in the road. Use other routes. | Heave | Construction | Southeast | Road | (53.48477663206405, -113.48610850244009) | |
590 | July 19 2018 | July 25 2018 | August 10 2018 | Current | Split to the North Side of 87 Ave | 87 Avenue Nw | 116 Street NW | 117 Street NW | Travel Delays | 2.5 Weeks | Starting Wednesday July 25 at 9am, 87 Ave from 116 St to 117 St will be split to the Northside for approximately 2.5 weeks. Use other routes. | Waterline Installation | Construction | Central | Road | (53.5229444876343, -113.53063018191627) | |
591 | July 19 2018 | July 19 2018 | July 26 2018 | Current | 97 Avenue Lane Reductions | 97 Avenue NW | 104 Street NW | 105 Street NW | Increased Travel Time | 1 Week | 97 Av WBD, 104 St - 105 St reduced to one lane. 97 Av EBD, 105 St - 104 St reduced to two lanes. Emergency watermain break. | Emergency Watermain Break | Construction | Central | Road | (53.534015905085525, -113.49894600586984) | |
592 | July 20 2018 | July 20 2018 | July 23 2018 | Current | 66 St Directional Closure | 66 Street NW | 167 Avenue NW | Anthony Henday Drive | Travel Delays | 4 days | 66 St northbound directional closure for 4 days for emergency manhole repairs. 66 St from 167 Av to Anthony Henday Drive | Emergency Manhole Repairs | Construction | Northeast | Road | (53.64701960703178, -113.43902885435031) | |
592 | July 20 2018 | July 20 2018 | July 23 2018 | Current | 66 St Directional Closure | 66 Street NW | 167 Avenue NW | Anthony Henday Drive | Travel Delays | 4 days | 66 St northbound directional closure for 4 days for emergency manhole repairs. 66 St from 167 Av to Anthony Henday Drive | Emergency Manhole Repairs | Construction | Northeast | Road | (53.62864221202404, -113.4428421858877) | |
593 | July 20 2018 | July 20 2018 | July 24 2018 | Emergency | 106 Street NB Closure | 106 Street NW | 100 Avenue NW | Jasper Avenue NW | Directional Closure | 5 Days | 106 Street NB from 100 Av to Jasper Av is closed due to a road subsidence. Access to 106 St is maintained from Jasper Av. | Road Subsidence | Construction | Central | Road | (53.538835001163775, -113.50292151667023) | |
596 | July 23 2018 | July 28 2018 | July 28 2018 | Current | Groat Road Total Closure | Groat Road NW | 87 Avenue NW | River Valley Road NW | Total Closure | Sat (8am - 2:30pm) | Groat Rd from 87 Av - River Valley Rd closed 8am - 2:30pm. Note closure includes Emily Murphy Park Road/Mayfair Overpass/Hawrelak Park Entrance and Saskatchewan Dr, 87 Av - 110 St. See attached map. Additional info at: http://edmonton.triathlon.org | ITU Triahtlon Special Event | Special Event | Central | Road | (53.53814512581992, -113.53710187564764) | |
595 | July 23 2018 | July 27 2018 | July 28 2018 | Current | Saskatchewan Drive NW | Saskatchewan Drive NW | 116 Street NW | Emily Murphy Park Road NW | Total Closure | Fri (12-8pm) Sat (2:30-5:30pm) | Note closure includes Emily Murphy Park Road /Mayfair Overpass from East of 116 Street to Hawrelak Park. See attached map. Additional info at: http://edmonton.triathlon.org | ITU Triathlon Special Event | Special Event | Central | Road | (53.530844145169176, -113.53071379131065) | |
596 | July 23 2018 | July 28 2018 | July 28 2018 | Current | Groat Road Total Closure | Groat Road NW | 87 Avenue NW | River Valley Road NW | Total Closure | Sat (8am - 2:30pm) | Groat Rd from 87 Av - River Valley Rd closed 8am - 2:30pm. Note closure includes Emily Murphy Park Road/Mayfair Overpass/Hawrelak Park Entrance and Saskatchewan Dr, 87 Av - 110 St. See attached map. Additional info at: http://edmonton.triathlon.org | ITU Triahtlon Special Event | Special Event | Central | Road | (53.52287423218436, -113.54077625911994) | |
594 | July 23 2018 | July 28 2018 | July 28 2018 | Current | Saskatchewan Drive NW | Saskatchewan Drive NW | 110 Street NW | 87 Avenue NW | Total Closure | Saturday (8am - 2:30pm) | Note closure includes Emily Murphy Park Rd /Mayfair Overpass from 116 Street to Hawrelak Park. Groat Rd, 87 Av - River Valley Rd. See attached map. Additional info at: http://edmonton.triathlon.org. | ITU Triathlon Special Event | Special Event | Central | Road | (53.52279655736342, -113.5406557644051) | |
594 | July 23 2018 | July 28 2018 | July 28 2018 | Current | Saskatchewan Drive NW | Saskatchewan Drive NW | 110 Street NW | 87 Avenue NW | Total Closure | Saturday (8am - 2:30pm) | Note closure includes Emily Murphy Park Rd /Mayfair Overpass from 116 Street to Hawrelak Park. Groat Rd, 87 Av - River Valley Rd. See attached map. Additional info at: http://edmonton.triathlon.org. | ITU Triathlon Special Event | Special Event | Central | Road | (53.52574821937133, -113.51501446147144) | |
597 | July 23 2018 | July 25 2018 | July 31 2018 | Current | 109 Street NB Lane Reduction | 109 Street NW | 110 Street NW | Kingsway | Travel Delays | 1 Week | 109 Street NB, 110 Av - Kingsway will be reduced to one lane NB starting on Wed, July 25th. The East sidewalk will also be closed. | Emergency Hydrant Repair | Construction | Central | Road and Sidewalk | (53.5608193020673, -113.50842180689861) | |
598 | July 23 2018 | July 23 2018 | July 23 2018 | Current | 15 min closure of Ellerslie Road SW westbound | ELLERSLIE ROAD SW | 101 STREET SW | GATEWAY BOULEVARD SW | Total Closure | 15 minutes | Ellerslie Road SW westbound, between 101 St and Gateway Boulevard will be closed for 15 minutes between the hours of 7:00 pm to 11:00 pm for overhead sign maintenance. | Overhead Sign Maintenance | Construction | Southeast | Road | (53.424817826093815, -113.48918883561413) |
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment